Run Meeting: March 19th, 2020

From clas12-run
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Back to Run Group F | Daily Run Group F Coordination Meetings

10:00AM Run Meeting, Counting house meeting room (200C)

RC: Carlos Ayerbe

Summary of past 24h:

  • RTPC + FMT work finished
  • RTPC + FMT lifted to First level


Plan:

  • Alignment of the RTPC with the beamline (ongoing).
  • Cabling RTPC to the crate.
    • Nathan B. indicates that should be cable to a different crate because there is no power supply available.
  • Connect the RTPC to the gas panel.
  • At 14h, PPE training by Bob Miller in the counting house.
    • Javier sent an email reminding the 6ft (~2m) separation between shift workers and maybe the need to use Tyvek suites and masks.
  • If everything is under control and on time, start taking cosmics all night.