Run Meeting: March 20th, 2020

From clas12-run
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Back to Run Group F | Daily Run Group F Coordination Meetings

10:00AM Run Meeting, Counting house meeting room (200C)

RC: Carlos Ayerbe

Summary of past 24h:

  • Summary in the RC Daily Report

https://logbooks.jlab.org/entry/3806359

  • HV issues (https://logbooks.jlab.org/entry/3806487):
    • in order to run cosmic, we tweak the HV GUI to short the delay time to ramp up the GEM voltage and reduce the cathode to -5500V
    • we were able to run op to -5600 (I guess Mohammad raised to -5650 and later in the night to -6100V but not sure when)
    • From the strip chart it is clear the RTPC trips around 04:30 Clonpc14 20200320 085446.gif

Plan:

  • Nate D. notice that the drift pressure was low (02:45), and no bubbles. I checked the gas shed and the manometer indicates 10psig in the pre-mix lines. We need to check that.

Image.png

  • BPM alignment ongoing.
  • Jiwan and Nathan B. should take a decision of the HV modules (keep in Yuri's crate, return to the original, make changes in software...?)
  • Install bubblers camera.
  • turn on blower (sucker).
  • RadCon to move RTPC1 to EEL bldg.
  • From Eugene:

What magnetic field configuration are we going to start with? Torus Inbending? outbending? Solenoid polarity and strength?

  • According to Sebastian, Stepan will help to set physics beam.
  • My ETA to have Hall ON, ~11:00

Slides

Info

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/7576835804