Difference between revisions of "01/03/2017 Meeting"
(Created page with " == Attendance == Thompson, Creel, Dixon, Oren, Michalski == Agenda and Notes == '''1. Operations ''' LINAC Running beam to Hall A. Trying to get it to Hall D but the t...") |
|||
Line 3: | Line 3: | ||
== Attendance == | == Attendance == | ||
− | Thompson, Creel, Dixon, | + | Thompson, Creel, Dixon, Wright, Michalski |
Line 10: | Line 10: | ||
'''1. Operations ''' | '''1. Operations ''' | ||
− | + | Plan is to go to 2K on both CHL plants Monday. | |
− | + | ESR shutdown this morning due to a problem with the cooling tower electrical feeder. | |
+ | CMTF is having problems with the LCLS2 cryomodule testing. | ||
− | |||
− | |||
− | |||
+ | '''2. Projects ''' | ||
+ | ESR Hall A 15K utube. A new utube is being built with a manual valve to replace the existing utube because it has a leak. | ||
− | |||
− | |||
+ | UIM | ||
+ | Work was scheduled to be finished by Christmas but it will drag over about 1 week. The reworked ventures should be here soon. (Dano, Troy, Fuentes, Conlin). The electrical team owes me an update. | ||
+ | Need to finish the plan. | ||
− | |||
− | |||
+ | CHL2 C6 | ||
+ | Material has come in. As soon as a crew frees up they will start on the spools. (Likely Willy) | ||
− | + | Must order electrical supplies including 4160v wire, 120v/480v conduit and wire. | |
− | + | We must find out the status of the funding. | |
− | |||
− | |||
+ | UITF | ||
+ | Pressure tests completed. Vacuum, leaks sealed. CM should be in place in 2 weeks to allow the final utube measurements to be taken. 4-5 weeks for building utubes. We have the parts.(Roy) | ||
− | + | The thermosiphon is expected to take 2 month to build and install. Likely to be Dano's crew once they complete UIM. | |
− | |||
− | |||
− | |||
− | |||
+ | HDIce return line is a fill in. Its low priority. | ||
− | |||
− | + | Hall B 12GeV | |
− | + | Flex lines for solenoid can. 4 months. (Jay) | |
− | |||
− | |||
− | |||
Line 73: | Line 67: | ||
LCLS2 | LCLS2 | ||
− | + | All but 2 bayonets were shipped. The remaining 2 had to wait for the original valve we spec'ed. The SLAC group overrode our valve selection for a cheaper valve that does not meet pressure requirements. | |
− | + | We are building two recovery compressors. Due in July 17'. Will take more hours because of seismic modifications. (Issac) | |
+ | We are building a guard vac skid for LCLS2. Not started. Due end of October 17'(Issac) | ||
+ | SLAC operations is interested in drafting a long term support agreement for after the machine is running. (??) | ||
− | |||
− | |||
+ | JLAB CHL | ||
+ | Guard vac skid is installed. The electrical power and controls need to be installed. They have one more box to install. We are waiting for wire to be delivered. | ||
− | |||
− | + | C7? | |
− | |||
− | + | Vaporizer | |
+ | We have most of the parts. | ||
− | |||
− | + | CTF | |
+ | |||
+ | Kinney suction piping is in engineering and design. The piping will be inside. We plan to buy supplies and build by the end of FY17' | ||
− | + | The gas management system modifications are in planning. | |
Revision as of 14:47, 3 January 2017
Attendance
Thompson, Creel, Dixon, Wright, Michalski
Agenda and Notes
1. Operations
Plan is to go to 2K on both CHL plants Monday.
ESR shutdown this morning due to a problem with the cooling tower electrical feeder.
CMTF is having problems with the LCLS2 cryomodule testing.
2. Projects
ESR Hall A 15K utube. A new utube is being built with a manual valve to replace the existing utube because it has a leak.
UIM
Work was scheduled to be finished by Christmas but it will drag over about 1 week. The reworked ventures should be here soon. (Dano, Troy, Fuentes, Conlin). The electrical team owes me an update.
Need to finish the plan.
CHL2 C6
Material has come in. As soon as a crew frees up they will start on the spools. (Likely Willy)
Must order electrical supplies including 4160v wire, 120v/480v conduit and wire.
We must find out the status of the funding.
UITF
Pressure tests completed. Vacuum, leaks sealed. CM should be in place in 2 weeks to allow the final utube measurements to be taken. 4-5 weeks for building utubes. We have the parts.(Roy)
The thermosiphon is expected to take 2 month to build and install. Likely to be Dano's crew once they complete UIM.
HDIce return line is a fill in. Its low priority.
Hall B 12GeV
Flex lines for solenoid can. 4 months. (Jay)
MSU
Working to accumulate the pressure systems documentation.
LCLS2
All but 2 bayonets were shipped. The remaining 2 had to wait for the original valve we spec'ed. The SLAC group overrode our valve selection for a cheaper valve that does not meet pressure requirements.
We are building two recovery compressors. Due in July 17'. Will take more hours because of seismic modifications. (Issac)
We are building a guard vac skid for LCLS2. Not started. Due end of October 17'(Issac)
SLAC operations is interested in drafting a long term support agreement for after the machine is running. (??)
JLAB CHL
Guard vac skid is installed. The electrical power and controls need to be installed. They have one more box to install. We are waiting for wire to be delivered.
C7?
Vaporizer
We have most of the parts.
CTF
Kinney suction piping is in engineering and design. The piping will be inside. We plan to buy supplies and build by the end of FY17'
The gas management system modifications are in planning.
Action Items
1. Must keep meeting to no more than 30 minutes
2. Finish appraisals
3. Kelly and Jonathan will work on proposal for the SLAC operations support agreement.