   - CEC 2017 Paper
 
   - CEC 2017 Paper
  
* CTF CBX3 Testing Process Model
+
* CTF CBX3 Testing
  
 
   - Model Development - Thilan (Completed FY 2016)
 
   - Model Development - Thilan (Completed FY 2016)
Line 30: Line 30:
 
   - Testing and Analysis
 
   - Testing and Analysis
  
* JLAB 2KCBX Performance Analysis
+
* JLab 2KCBX Performance Analysis
  
 
   - Discuss with Rao
 
   - Discuss with Rao
  
* JLAB Operational Procedures
+
* JLab Operational Procedures
  
 
   - CHL2 4K / 2K Pump-down (Completed FY 2016)
 
   - CHL2 4K / 2K Pump-down (Completed FY 2016)

Revision as of 16:27, 19 January 2017

Projects

Updated: 1/19/2017

  • LINAC Heater Control Algorithm
  - Write-up Pseudo-Code based on Algorithm
  - Develop design for UI
  - Troubleshoot / Find Bugs in the Algorithm
  • ESR2 Process Model
  - Model Development (Completed FY 2016)
  - Load Support Modes (Completed FY 2016)
  - Mode / Performance Analysis
  - CEC 2017 Paper
  • CTF CBX3 Testing
 - Model Development - Thilan (Completed FY 2016)
 - Testing Spreadsheet Development
 - Testing Modes
 - Analysis
 - Possible CEC 2017 Paper
  • CHL2 C6 Commissioning
 - Development of Plans
 - Calculation spreadsheet development
 - Testing and Analysis
  • JLab 2KCBX Performance Analysis
 - Discuss with Rao
  • JLab Operational Procedures
 - CHL2 4K / 2K Pump-down (Completed FY 2016)
 - CHL2 Warm Compressor Start-up / Swing / Switch-over

  • JLab Helium Inventory Monitoring
  - Model Development (Completed FY 2015)
  - Data Collection and Revisions (Completed FY 2016)
  - Upgrades
  - CEC 2017 Paper

OPS