(Created page with " == Attendance == Thompson, Creel, Dixon, Michalski, Oren, Arenius is on his way back from Ohio == Agenda and Notes == '''1. Operations ''' LINAC Normal CHL1 Repea...")
 
 
Line 19: Line 19:
 
CHL1
 
CHL1
  
Repeated intermittent problems with SC1 CC1 magnetic bearing cabinet. We are investigating.
+
No additional problems from SC1 CC1 mag bearing cabinet. This series of events cost us 16 hours of DT.
  
  
Line 25: Line 25:
  
 
Normal
 
Normal
 +
 +
One unplanned event resulted in T7 shutdown. Restart went fine.
  
  
 
ESR
 
ESR
  
Normal.  
+
One unplanned event where system balancing at high load resulted in a T2 trip. Restart resulted in T1, T2, and first stage compressor.
 +
 
 +
One planned event to allow Hall C to switch utube configuration. Two day recovery.
  
Halls are using maximum capacity of the ESR. Use of the transerline is dependent on the issues at CHl1.
+
Halls are using more than the maximum capacity of the ESR. Use of the transerline is dependent on the issues at CHl1. There was a Directors Review report a number of years ago that deals with this issue.
  
  
Line 38: Line 42:
  
 
Normal
 
Normal
 +
 +
The cryomodule was warmed up and utubes were pulled on Sunday. A few hours later the power outages began. Expander 2A suffered a bearing failure and had to have a flywheel change.
  
  
Line 44: Line 50:
 
Normal.  
 
Normal.  
  
Operators did notice that each time the magnet is ramped the vacuum softens in coil #2 and #4. Seems to be normal for the system. Might be related to the change in lead flow effecting localized nitrogen ice sublimation because of the known LN2 to vacuum space leaks on these two magnets.
+
Compressor was accidentally shutdown by maintenance tech. Unit was restarted quickly so cold box did not trip. The feed forward safety signal between the HDR PLC and the magnet PLC told the solenoid to ramp down just in case.  
  
  
 
'''2. Projects '''
 
'''2. Projects '''
 
  
 
UIM
 
UIM
Line 57: Line 62:
 
UITF
 
UITF
  
 +
Thermosiphon drawings out for approval.
  
  
 
MSU
 
MSU
  
Working to accumulate the pressure systems documentation. Concerns over information sharing.  
+
Working to accumulate the pressure systems documentation.  
  
  
Line 77: Line 83:
 
'''3. Manpower '''
 
'''3. Manpower '''
  
New engineer arriving mid Feb. He will work 75% of his time on EI&C for LCLS2 and remainder on OPS.  
+
New engineer arriving next week. He will work 75% of his time on EI&C for LCLS2 and remainder on ESR2. We have a space for him. I will check on computer.
 
 
  
  
Line 84: Line 89:
 
'''4. Info from Will '''
 
'''4. Info from Will '''
  
1. LN2 contract proposals are in.  
+
1. LN2 contract proposals are in and have been routed to DOE for approval.
  
 
2. New director starts Apr 3.
 
2. New director starts Apr 3.
 +
 +
3. Let Will know if anyone approaches us to provide an estimate for installing an LCLS2 module in LERF.
  
 
4. Funding could impact summer shutdown schedule possibly forcing the shutdown of CHL2 earlier than the May bill read. Possibly as early as 23 March. We are moving ahead with electrical installation and fabrication of the piping spools for this job.
 
4. Funding could impact summer shutdown schedule possibly forcing the shutdown of CHL2 earlier than the May bill read. Possibly as early as 23 March. We are moving ahead with electrical installation and fabrication of the piping spools for this job.
 +
 +
5. LERF is still hoping to get the medical isotope contract in 18'
  
  
  
 
'''5. Other '''
 
'''5. Other '''
 +
 +
Machie send out a request asking how many people still use ME10.
 +
  
 
== Action Items ==
 
== Action Items ==
Line 102: Line 114:
  
 
== Action Item Updates ==
 
== Action Item Updates ==
1. We are going to start preliminary design of the 2K cold box replacement.
+
1. Need to choose 2 engineers to let Kandice Carter come take pictures of for engineers week.
 +
 
 +
We are going to start preliminary design of the 2K cold box replacement.
  
 
2. Investigate possibility of buying another welder (<$6K)
 
2. Investigate possibility of buying another welder (<$6K)

Latest revision as of 09:12, 9 February 2017

Attendance

Thompson, Creel, Dixon, Michalski, Oren,

Arenius is on his way back from Ohio


Agenda and Notes

1. Operations

LINAC

Normal


CHL1

No additional problems from SC1 CC1 mag bearing cabinet. This series of events cost us 16 hours of DT.


CHL2

Normal

One unplanned event resulted in T7 shutdown. Restart went fine.


ESR

One unplanned event where system balancing at high load resulted in a T2 trip. Restart resulted in T1, T2, and first stage compressor.

One planned event to allow Hall C to switch utube configuration. Two day recovery.

Halls are using more than the maximum capacity of the ESR. Use of the transerline is dependent on the issues at CHl1. There was a Directors Review report a number of years ago that deals with this issue.


CTF

Normal

The cryomodule was warmed up and utubes were pulled on Sunday. A few hours later the power outages began. Expander 2A suffered a bearing failure and had to have a flywheel change.


HDR

Normal.

Compressor was accidentally shutdown by maintenance tech. Unit was restarted quickly so cold box did not trip. The feed forward safety signal between the HDR PLC and the magnet PLC told the solenoid to ramp down just in case.


2. Projects

UIM

Shutdown scheduled for Feb 17. We are finalizing the detailed daily work plan.


UITF

Thermosiphon drawings out for approval.


MSU

Working to accumulate the pressure systems documentation.


LCLS2

Cold compressor review in France went well. Only real surprise was the seismic results forced the manufacturer to increase the thickness of the base plates. Smith Group is an A&E firm to help SLAC put together the installation package. SLAC will not be able to get an installation contract in place until ~Sep even though equipment begins arriving in Apr.


Korea

Review went fine. They are still interested in a collaboration


3. Manpower

New engineer arriving next week. He will work 75% of his time on EI&C for LCLS2 and remainder on ESR2. We have a space for him. I will check on computer.


4. Info from Will

1. LN2 contract proposals are in and have been routed to DOE for approval.

2. New director starts Apr 3.

3. Let Will know if anyone approaches us to provide an estimate for installing an LCLS2 module in LERF.

4. Funding could impact summer shutdown schedule possibly forcing the shutdown of CHL2 earlier than the May bill read. Possibly as early as 23 March. We are moving ahead with electrical installation and fabrication of the piping spools for this job.

5. LERF is still hoping to get the medical isotope contract in 18'


5. Other

Machie send out a request asking how many people still use ME10.


Action Items

1. Must keep meeting to no more than 30 minutes

2. Plan the replacement of the SC2 power feedthrus.


Action Item Updates

1. Need to choose 2 engineers to let Kandice Carter come take pictures of for engineers week.

We are going to start preliminary design of the 2K cold box replacement.

2. Investigate possibility of buying another welder (<$6K)