Difference between revisions of "David Schleeper work items"
From Cryowiki
Jump to navigationJump to search (→JLab) |
|||
Line 4: | Line 4: | ||
* CHL: | * CHL: | ||
1 Replacement/upgrade of LN2 fill station gauging: | 1 Replacement/upgrade of LN2 fill station gauging: | ||
− | - | + | -Gauges have been replaced but the Dewar #1 Gauge is reading incorrectly. Working to repair. |
− | |||
− | |||
− | |||
− | |||
− | |||
2 CHL Guard Vacuum | 2 CHL Guard Vacuum | ||
Line 15: | Line 10: | ||
-Pressure System: Signed | -Pressure System: Signed | ||
-Drawings: Complete | -Drawings: Complete | ||
− | -Fabrication: Removal/repair of the hand rail. | + | -Fabrication: Removal/repair of the hand rail. Grouting and leg re-work. |
-Operations: Will need to remove feet, grout, shim and anchor the feet. Will require welding. | -Operations: Will need to remove feet, grout, shim and anchor the feet. Will require welding. | ||
-Testing: To be initial service leak checked upon completion of electrical work. Pump temperatures will also need to be monitored. | -Testing: To be initial service leak checked upon completion of electrical work. Pump temperatures will also need to be monitored. | ||
Line 37: | Line 32: | ||
− | 5 | + | 5 ESR ORS Carbon Replacement |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
-Materials: Lifting adapter approved by Sprouse. Estimating ~$350 for materials | -Materials: Lifting adapter approved by Sprouse. Estimating ~$350 for materials | ||
-Pressure System: N/A | -Pressure System: N/A | ||
Line 54: | Line 40: | ||
-Testing: Spool pieces will need to be tested. | -Testing: Spool pieces will need to be tested. | ||
− | |||
− | |||
− | + | 6 ESR Oil collection | |
− | -Materials: Ordered | + | -Materials: Ordered, waiting on sight glass to arrive. |
-Pressure System: N/A | -Pressure System: N/A | ||
-Drawings: Sketch delivered to shop. | -Drawings: Sketch delivered to shop. | ||
-Fabrication: TBD | -Fabrication: TBD | ||
-Operations: Will require familiarity with system prior to installation. | -Operations: Will require familiarity with system prior to installation. | ||
− | -Testing: | + | -Testing: N/A, down stream of relief. |
− | + | 7 CHL IA modification | |
-Materials: ordered | -Materials: ordered | ||
-Pressure System: Cat D | -Pressure System: Cat D | ||
Line 74: | Line 58: | ||
-Testing: Initial service leak test | -Testing: Initial service leak test | ||
− | + | 8 NL Cool Down Tie-in | |
− | - | + | -Will purge and tie-in cool down valve |
==ESR Status== | ==ESR Status== |
Revision as of 15:16, 15 March 2017
JLab
2/16 Update
- CHL:
1 Replacement/upgrade of LN2 fill station gauging: -Gauges have been replaced but the Dewar #1 Gauge is reading incorrectly. Working to repair.
2 CHL Guard Vacuum -Materials: installed -Pressure System: Signed -Drawings: Complete -Fabrication: Removal/repair of the hand rail. Grouting and leg re-work. -Operations: Will need to remove feet, grout, shim and anchor the feet. Will require welding. -Testing: To be initial service leak checked upon completion of electrical work. Pump temperatures will also need to be monitored.
3 LN2 Dewar #1 instrumentation tubing replacement -Materials: On-site -Pressure System: Signed -Drawings: Complete -Fabrication: All paperwork and materials are with Scott. He is scheduling. -Operations: N/A -Testing: To be initial service leak checked upon completion.
4 LN2 PBC leaks -Materials: TBD -Pressure System: TBD -Drawings: TBD -Fabrication: TBD -Operations: All leaks have been identified and tabulated. Ops is investigating the repair of threaded connections. -Testing: Snoop
5 ESR ORS Carbon Replacement -Materials: Lifting adapter approved by Sprouse. Estimating ~$350 for materials -Pressure System: N/A -Drawings: Need to be developed. Sent to Corey for him to prioritize. -Fabrication: awaiting drawings -Operations: Needs to be scheduled/planned. Probably next summer -Testing: Spool pieces will need to be tested.
6 ESR Oil collection -Materials: Ordered, waiting on sight glass to arrive. -Pressure System: N/A -Drawings: Sketch delivered to shop. -Fabrication: TBD -Operations: Will require familiarity with system prior to installation. -Testing: N/A, down stream of relief.
7 CHL IA modification -Materials: ordered -Pressure System: Cat D -Drawings: in development -Fabrication: TBD -Operations: N/A -Testing: Initial service leak test
8 NL Cool Down Tie-in -Will purge and tie-in cool down valve
ESR Status
- Hall A:
- Magnets cold, on cold return, controlling properly - Warm flows return to ESR - Target cold.
- Hall B:K
- Torus at - Warm flows return to CHL - Solenoid scheduled for May delivery
- Hall C:
- All magnets cold, on cold return - Warm flows return to CHL - Return transfer line replacement did not alleviate magnet pressure issue. - Q3 and dipole testing underway. - Target was successfully cooled and maintained on 2/28. - KPP scheduled for March.