Difference between revisions of "Cryo Ops Meeting"

From Cryowiki
Jump to navigationJump to search
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Cryogenic Operations 7:30 morning Tool Box meeting ==
 
  
  
* Norris
 
 
*ESR 80K Beds Regen Stapleton
 
*ESR 80K Beds Regen Stapleton
  
Line 10: Line 8:
 
{| class="wikitable" border="1"
 
{| class="wikitable" border="1"
 
|-
 
|-
!width="250"| Maintenance Task
+
!width="250"| Task
!width="250"| Assigned Tech
+
!width="250"| Tech
 
!width="250"| Status
 
!width="250"| Status
!width="250"|  
+
!width="250"| CTLis
 
|-
 
|-
| SBR C2
+
| align="center"| SBR C2
| Norris
+
| align="center"| Norris
|  
+
| align="center"| ?
|
+
| align="center"| [http://devweb.acc.jlab.org/CSUEApps/ctlis/task/3324 CTLis]
 +
|-
 +
| align="center"| Task
 +
| align="center"| Tech
 +
| align="center"| Status
 +
| align="center"| CTLis
 
|}
 
|}

Latest revision as of 13:31, 4 January 2017


  • ESR 80K Beds Regen Stapleton


Week of Jan 2nd, 2017

Task Tech Status CTLis
SBR C2 Norris ? CTLis
Task Tech Status CTLis