(Created page with "== Current Fabrication Shop Priorities == The priorities are always changing. Cryogenics Operations 12GeV Hall B CTF LN2 VJ line repair (during a CTF shutdown) GPP CTF Ga...")
 
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Current Fabrication Shop Priorities ==
+
* [[ Long range research priorities | 12/20/2017 2018+ Research Priorities ]]
 +
* [[ 01/01/2017 Priorities| 01/01/2017 Priorities]]
  
The priorities are always changing.
 
  
Cryogenics Operations
+
Keep in mind that priorities are always fluctuating. This list is for general information. Specific questions should be directed to your supervisor.
 
 
12GeV Hall B
 
 
 
CTF LN2 VJ line repair (during a CTF shutdown)
 
 
 
GPP CTF Gas Management Tie Ins (during a CTF shutdown)
 
 
 
UIM  CTF CB3
 
 
 
UITF Thermosiphon and piping
 
 
 
UITF UTubes
 
 
 
UIM CHL2 C6
 
 
 
LCLS2 Recovery Compressors
 
 
 
ESR Hall A 15K UTube
 
 
 
LCLS2 Guard Vacuum
 
 
 
CHL vaporizer
 
 
 
CHL C7
 
 
 
LINAC Spare UTubes
 
 
 
UITF HDIce return line
 
 
 
CHL2 Shield UTubes
 
 
 
CHL2 Water Solenoid
 
 
 
SBR Piping Removal
 
 
 
 
 
== Current Electrical Shop Priorities ==
 
 
 
Cryogenics Operations
 
 
 
12GeV Hall B
 
 
 
UIM  CTF CB3 and Controls Upgrade
 
 
 
UITF Controls
 
 
 
UIM CHL2 C6
 
 
 
LCLS2 Recovery Compressors
 
 
 
LCLS2 Guard Vacuum
 
 
 
CHL C7
 

Latest revision as of 14:16, 20 December 2017


Keep in mind that priorities are always fluctuating. This list is for general information. Specific questions should be directed to your supervisor.