==Projects==
 
==Projects==
 +
 +
Updated: 1/30/2017
  
 
* LINAC Heater Control Algorithm
 
* LINAC Heater Control Algorithm
  
   - Write-up Pseudo-Code based on Algorithm
+
   - Write-up Pseudo-Code based on Algorithm (sent 1/24/2017)
 
   - Develop design for UI
 
   - Develop design for UI
 
   - Troubleshoot / Find Bugs in the Algorithm
 
   - Troubleshoot / Find Bugs in the Algorithm
 +
 +
* ESR2 Process Model
 +
 +
  - Model Development (Completed FY 2016)
 +
  - Load Support Modes (Completed FY 2016)
 +
  - Mode / Performance Analysis
 +
  - CEC 2017 Paper
 +
 +
* CTF CBX3 Testing
 +
 +
  - Model Development - Thilan (Completed FY 2016)
 +
  - Testing Spreadsheet Development
 +
  - Testing Modes
 +
  - Analysis
 +
  - Possible CEC 2017 Paper
 +
 +
* CHL2 C6 Commissioning
 +
 +
  - Development of Plans
 +
  - Calculation spreadsheet development
 +
  - Testing and Analysis
 +
 +
* JLab 2KCBX Performance Analysis
 +
 +
  - Discuss with Rao
 +
 +
* JLab Operational Procedures
 +
 +
  - CHL2 4K / 2K Pump-down (Completed FY 2016)
 +
  - CHL2 Warm Compressor Start-up / Swing / Switch-over
 +
 +
* JLab Helium Inventory Monitoring
 +
 +
  - Model Development (Completed FY 2015)
 +
  - Data Collection and Revisions (Completed FY 2016)
 +
  - Upgrades
 +
  - CEC 2017 Paper
  
 
==OPS==
 
==OPS==
 +
 +
Updated 1/30/2017
 +
 +
* CHL General
 +
 +
  - Recovery C9 Load Valve Troubleshoot (do not unload on request)
 +
  - Purifier Regen. (issues with heating properly).
 +
 +
 +
* CHL1 / SC1 / SL-FEL
 +
 +
  - CHL-ESR TL in use for Hall B C/D
 +
  - on that note, we need to schedule a test (possibly at the end of the run) to measure CHL1 capacity (i.e. whether it's able to supply 30 g/s 4K flow without hampering LINAC operations).
 +
  - Measure ESR daily helium losses (whether 'fixing' Hall C U-Tube affected the daily losses).
 +
 +
 +
* CHL2 / SC2 / NL
 +
 +
  - Dewar LL probe is anything but accurate!
 +
  - NL Auto-heat is having issues with RF mis-match (LEM values were set: week of 1/23).
 +
  - SC2 Trip - Secure Control Development (How to automatically set-up CHL2 in the event of a trip?).
 +
  - iocnl1 reboot-restore issue (Fixed: week of 1/23)
 +
  - superMOPS testing (Done: week of 1/23)
 +
  - SC2 HX-10N Dp at 3 mbar (1/30/2017)

Latest revision as of 15:07, 30 January 2017

Projects

Updated: 1/30/2017

  • LINAC Heater Control Algorithm
  - Write-up Pseudo-Code based on Algorithm (sent 1/24/2017)
  - Develop design for UI
  - Troubleshoot / Find Bugs in the Algorithm
  • ESR2 Process Model
  - Model Development (Completed FY 2016)
  - Load Support Modes (Completed FY 2016)
  - Mode / Performance Analysis
  - CEC 2017 Paper
  • CTF CBX3 Testing
 - Model Development - Thilan (Completed FY 2016)
 - Testing Spreadsheet Development
 - Testing Modes
 - Analysis
 - Possible CEC 2017 Paper
  • CHL2 C6 Commissioning
 - Development of Plans
 - Calculation spreadsheet development
 - Testing and Analysis
  • JLab 2KCBX Performance Analysis
 - Discuss with Rao
  • JLab Operational Procedures
 - CHL2 4K / 2K Pump-down (Completed FY 2016)
 - CHL2 Warm Compressor Start-up / Swing / Switch-over

  • JLab Helium Inventory Monitoring
  - Model Development (Completed FY 2015)
  - Data Collection and Revisions (Completed FY 2016)
  - Upgrades
  - CEC 2017 Paper

OPS

Updated 1/30/2017

  • CHL General
  - Recovery C9 Load Valve Troubleshoot (do not unload on request)
  - Purifier Regen. (issues with heating properly).

  • CHL1 / SC1 / SL-FEL
  - CHL-ESR TL in use for Hall B C/D
  - on that note, we need to schedule a test (possibly at the end of the run) to measure CHL1 capacity (i.e. whether it's able to supply 30 g/s 4K flow without hampering LINAC operations).
  - Measure ESR daily helium losses (whether 'fixing' Hall C U-Tube affected the daily losses).


  • CHL2 / SC2 / NL
  - Dewar LL probe is anything but accurate!
  - NL Auto-heat is having issues with RF mis-match (LEM values were set: week of 1/23).
  - SC2 Trip - Secure Control Development (How to automatically set-up CHL2 in the event of a trip?).
  - iocnl1 reboot-restore issue (Fixed: week of 1/23)
  - superMOPS testing (Done: week of 1/23)
  - SC2 HX-10N Dp at 3 mbar (1/30/2017)