− | + | --Relief spool OSP (in review) | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | --CHL2 Relief Valve OSP | |
− | CTF- | + | --New Kinney Tank (Leaked sealed/$1400 repair quote from Triad-schedule with Shirley) |
+ | |||
+ | --EV development (drawing in process, most parts ordered) | ||
+ | |||
+ | --CTF Inventory Calculation Refinement | ||
+ | |||
+ | --P&I for Nate on removing and installing the junction box relief valves | ||
+ | |||
+ | --Drawings for review LL sensor, relief valve set drawings, compressor relief valve dwg. (Complete) | ||
+ | -Order forms | ||
+ | -OSP | ||
+ | |||
+ | --CHL2 RVs | ||
+ | |||
+ | --CTF Dewar and Main Compressor Relief Valves. | ||
+ | |||
+ | --Working on changing the next three relief valves, RV2450, RV243SU and RV243RT. | ||
+ | |||
+ | --Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage | ||
+ | |||
+ | --CTF Recovery Compressor C4 and C6 P&I | ||
+ | |||
+ | --Install the C.V. on C9 | ||
+ | |||
+ | --Pressure Systems Part 9 review and comments to K. Dixon -Done | ||
+ | --Flexitallic Flange torque requirements -Done | ||
+ | |||
+ | --Develop Milestone/schedule -Done | ||
+ | |||
+ | -Someone to cut Kinney Sight glass. -Done | ||
+ | |||
+ | --FlowSafe Dwgs per selected based on calculation. -Done | ||
+ | |||
+ | --Sightglass for the RV on compressors -Done | ||
+ | |||
+ | |||
+ | --KelF ring for EV245RT/DWG Dimensions. -Done | ||
+ | |||
+ | --Addressing EV245RT Leak. Currently working on repair. -Done | ||
+ | |||
+ | |||
+ | |||
+ | --Sight Glass Assembly Installation at Kinney Pump - -Done | ||
+ | |||
+ | |||
+ | --Relief Valve Instrumentation/Protected Zones (CTF Complete) | ||
+ | |||
+ | |||
+ | --Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant. | ||
+ | |||
+ | --Id relief valves on CHL2 | ||
+ | |||
+ | --Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan. | ||
+ | Waiting for the drawings to be completed. The John C Ernst soft parts are on order. | ||
+ | |||
+ | --CHL Recovery Compressor Header Redesign | ||
+ | |||
+ | --Develop CTF Document - Ongoing | ||
+ | |||
+ | --CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage | ||
+ | |||
+ | --CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete | ||
+ | |||
+ | --Recovery Compressor LOTO Review (Complete)-Second Review Complete | ||
+ | |||
+ | --Dunham-Bush Check Valve Hinge Installation Verification (Complete) | ||
+ | |||
+ | --Recovery Compressor Pipe Analysis (Complete) | ||
+ | --LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete) | ||
+ | --Bolting "Procedure" - complete | ||
+ | --Shaft Seal on Kinney for M. Wright - complete |
Latest revision as of 12:51, 17 May 2017
--Relief spool OSP (in review)
--CHL2 Relief Valve OSP
--New Kinney Tank (Leaked sealed/$1400 repair quote from Triad-schedule with Shirley)
--EV development (drawing in process, most parts ordered)
--CTF Inventory Calculation Refinement
--P&I for Nate on removing and installing the junction box relief valves --Drawings for review LL sensor, relief valve set drawings, compressor relief valve dwg. (Complete) -Order forms -OSP
--CHL2 RVs
--CTF Dewar and Main Compressor Relief Valves.
--Working on changing the next three relief valves, RV2450, RV243SU and RV243RT.
--Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
--CTF Recovery Compressor C4 and C6 P&I
--Install the C.V. on C9
--Pressure Systems Part 9 review and comments to K. Dixon -Done --Flexitallic Flange torque requirements -Done
--Develop Milestone/schedule -Done
-Someone to cut Kinney Sight glass. -Done
--FlowSafe Dwgs per selected based on calculation. -Done
--Sightglass for the RV on compressors -Done
--KelF ring for EV245RT/DWG Dimensions. -Done
--Addressing EV245RT Leak. Currently working on repair. -Done
--Sight Glass Assembly Installation at Kinney Pump - -Done
--Relief Valve Instrumentation/Protected Zones (CTF Complete)
--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.
--Id relief valves on CHL2
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan. Waiting for the drawings to be completed. The John C Ernst soft parts are on order.
--CHL Recovery Compressor Header Redesign --Develop CTF Document - Ongoing
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
--CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
--Recovery Compressor LOTO Review (Complete)-Second Review Complete
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
--Recovery Compressor Pipe Analysis (Complete) --LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete) --Bolting "Procedure" - complete --Shaft Seal on Kinney for M. Wright - complete