1/19/2017
 
  
CTF - Monitor plant operations and update spreadsheets.
+
--Relief spool OSP (in review)
Lifting Lug Analysis for LCLS II Spreader.
 
CTF UIM Update Meeting.
 
HX in Linac Discussion with Nusair.
 
Check Valve for Recovery Compressor/Carl.
 
Weld Analysis for LCLS II Spreader.
 
  
1/20/2017
+
--CHL2 Relief Valve OSP
  
CTF-Morning Meeting, review plant conditions  (fill rate dropped from 0.4 to 0.18) and update spreadsheets. Learned myStat program for getting CTF performance data. Try and obtain AWS D14.1 for weld calc. Working on spreader beam analysis. CHL Recovery Header and LL Sensor Meeting.
+
--New Kinney Tank (Leaked sealed/$1400 repair quote from Triad-schedule with Shirley)
  
1/23/2014
+
--EV development (drawing in process, most parts ordered)
  
CTF-Morning Meeting, review plant conditions/spreadsheets, go over walk-around details with Bill, Beam analysis, AWS D14.1
+
--CTF Inventory Calculation Refinement
 +
 
 +
--P&I for Nate on removing and installing the junction box relief valves
 +
 +
--Drawings for review LL sensor, relief valve set drawings, compressor relief valve dwg. (Complete)
 +
  -Order forms
 +
  -OSP
 +
 
 +
--CHL2 RVs
 +
 
 +
--CTF Dewar and Main Compressor Relief Valves.
 +
 
 +
--Working on changing the next three relief valves, RV2450, RV243SU and RV243RT. 
 +
 
 +
--Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
 +
 
 +
--CTF Recovery Compressor C4 and C6 P&I
 +
 
 +
--Install the C.V. on C9
 +
 
 +
--Pressure Systems Part 9 review and comments to K. Dixon -Done
 +
--Flexitallic Flange torque requirements -Done
 +
 
 +
--Develop Milestone/schedule -Done
 +
 
 +
-Someone to cut Kinney Sight glass.  -Done
 +
 
 +
--FlowSafe Dwgs per selected based on calculation. -Done
 +
 
 +
--Sightglass for the RV on compressors -Done
 +
 +
 
 +
--KelF ring for EV245RT/DWG Dimensions.  -Done
 +
 
 +
--Addressing EV245RT Leak. Currently working on repair.  -Done 
 +
 
 +
 
 +
 
 +
--Sight Glass Assembly Installation at Kinney Pump -  -Done 
 +
 
 +
 
 +
--Relief Valve Instrumentation/Protected Zones (CTF Complete)
 +
 
 +
 
 +
--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.
 +
 
 +
--Id relief valves on CHL2
 +
 
 +
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
 +
Waiting for the drawings to be completed. The John C Ernst soft parts are on order. 
 +
 
 +
--CHL Recovery Compressor Header Redesign
 +
 +
--Develop CTF Document - Ongoing
 +
 
 +
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
 +
 
 +
--CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
 +
 
 +
  --Recovery Compressor LOTO Review (Complete)-Second Review Complete
 +
 
 +
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
 +
 
 +
--Recovery Compressor Pipe Analysis (Complete)
 +
--LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)
 +
--Bolting "Procedure" - complete
 +
--Shaft Seal on Kinney for M. Wright - complete

Latest revision as of 12:51, 17 May 2017

--Relief spool OSP (in review)
--CHL2 Relief Valve OSP
--New Kinney Tank (Leaked sealed/$1400 repair quote from Triad-schedule with Shirley)
--EV development (drawing in process, most parts ordered)
--CTF Inventory Calculation Refinement
--P&I for Nate on removing and installing the junction box relief valves

--Drawings for review LL sensor, relief valve set drawings, compressor relief valve dwg. (Complete)
  -Order forms
  -OSP
--CHL2 RVs
--CTF Dewar and Main Compressor Relief Valves. 
--Working on changing the next three relief valves, RV2450, RV243SU and RV243RT.  
--Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
--CTF Recovery Compressor C4 and C6 P&I 
--Install the C.V. on C9
--Pressure Systems Part 9 review and comments to K. Dixon -Done
--Flexitallic Flange torque requirements -Done
--Develop Milestone/schedule -Done
-Someone to cut Kinney Sight glass.  -Done
--FlowSafe Dwgs per selected based on calculation. -Done
--Sightglass for the RV on compressors -Done

--KelF ring for EV245RT/DWG Dimensions.  -Done
--Addressing EV245RT Leak. Currently working on repair.  -Done  


--Sight Glass Assembly Installation at Kinney Pump -  -Done  


--Relief Valve Instrumentation/Protected Zones (CTF Complete)


--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.

--Id relief valves on CHL2 
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
Waiting for the drawings to be completed. The John C Ernst soft parts are on order.  
--CHL Recovery Compressor Header Redesign

--Develop CTF Document - Ongoing
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
--CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
 --Recovery Compressor LOTO Review (Complete)-Second Review Complete
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
--Recovery Compressor Pipe Analysis (Complete)
--LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)
--Bolting "Procedure" - complete
--Shaft Seal on Kinney for M. Wright - complete