(Created page with " == Attendance == Thompson, Creel, Dixon, Michalski, Oren, Arenius is on his way back from Ohio == Agenda and Notes == '''1. Operations ''' LINAC Normal CHL1 No ad...")
 
 
Line 2: Line 2:
 
== Attendance ==
 
== Attendance ==
  
Thompson, Creel, Dixon, Michalski, Oren,  
+
Thompson, Creel, Dixon, Michalski, Oren, Arenius  
 
 
Arenius is on his way back from Ohio
 
  
  
Line 11: Line 9:
  
 
'''1. Operations '''
 
'''1. Operations '''
 +
 +
MFA
 +
 +
No one from cryo has access to the operations screens from home. I have called Kowalski, helpdesk, and put in a CCPR.
 +
  
 
LINAC
 
LINAC
Line 18: Line 21:
  
 
CHL1
 
CHL1
 
No additional problems from SC1 CC1 mag bearing cabinet. This series of events cost us 16 hours of DT.
 
  
  
Line 26: Line 27:
 
Normal
 
Normal
  
One unplanned event resulted in T7 shutdown. Restart went fine.
 
  
  
 
ESR
 
ESR
  
One unplanned event where system balancing at high load resulted in a T2 trip. Restart resulted in T1, T2, and first stage compressor.
+
Hall C believes the high SHMS back pressure is because of the flexible anaconda. They are working on a plan.
 
 
One planned event to allow Hall C to switch utube configuration. Two day recovery.
 
 
 
Halls are using more than the maximum capacity of the ESR. Use of the transerline is dependent on the issues at CHl1. There was a Directors Review report a number of years ago that deals with this issue.
 
  
  
Line 43: Line 39:
 
Normal
 
Normal
  
The cryomodule was warmed up and utubes were pulled on Sunday. A few hours later the power outages began. Expander 2A suffered a bearing failure and had to have a flywheel change.  
+
The CTF shutdown is scheduled for tomorrow morning.  
  
  
 
HDR
 
HDR
  
Normal.  
+
Normal. The solenoid did have an issue with their LN2 control valve. Problem was solved but no one really knows why.
 
 
Compressor was accidentally shutdown by maintenance tech. Unit was restarted quickly so cold box did not trip. The feed forward safety signal between the HDR PLC and the magnet PLC told the solenoid to ramp down just in case.  
 
  
  
Line 57: Line 51:
 
UIM
 
UIM
  
Shutdown scheduled for Feb 17. We are finalizing the detailed daily work plan.
+
Shutdown scheduled for Feb 17.  
  
  
 
UITF
 
UITF
  
Thermosiphon drawings out for approval.  
+
Thermosiphon is being fabricated.  
  
  
Line 72: Line 66:
 
LCLS2
 
LCLS2
  
Cold compressor review in France went well. Only real surprise was the seismic results forced the manufacturer to increase the thickness of the base plates. Smith Group is an A&E firm to help SLAC put together the installation package. SLAC will not be able to get an installation contract in place until ~Sep even though equipment begins arriving in Apr.
+
Ritendra starts today he will be assigned to the LCLS2 Monday to help with controls. The ECAD designer was extended through May.
 
 
 
 
Korea
 
 
 
Review went fine. They are still interested in a collaboration
 
  
  
Line 83: Line 72:
 
'''3. Manpower '''
 
'''3. Manpower '''
  
New engineer arriving next week. He will work 75% of his time on EI&C for LCLS2 and remainder on ESR2. We have a space for him. I will check on computer.
+
Ritendra starts today. He has an office and has a computer.
  
  
Line 114: Line 103:
  
 
== Action Item Updates ==
 
== Action Item Updates ==
1. Need to choose 2 engineers to let Kandice Carter come take pictures of for engineers week.
+
1. Kandice Carter took pictures of two of our new engineers for engineers week.
 
 
We are going to start preliminary design of the 2K cold box replacement.
 
  
2. Investigate possibility of buying another welder (<$6K)
+
2.

Latest revision as of 10:11, 16 February 2017

Attendance

Thompson, Creel, Dixon, Michalski, Oren, Arenius


Agenda and Notes

1. Operations

MFA

No one from cryo has access to the operations screens from home. I have called Kowalski, helpdesk, and put in a CCPR.


LINAC

Normal


CHL1


CHL2

Normal


ESR

Hall C believes the high SHMS back pressure is because of the flexible anaconda. They are working on a plan.


CTF

Normal

The CTF shutdown is scheduled for tomorrow morning.


HDR

Normal. The solenoid did have an issue with their LN2 control valve. Problem was solved but no one really knows why.


2. Projects

UIM

Shutdown scheduled for Feb 17.


UITF

Thermosiphon is being fabricated.


MSU

Working to accumulate the pressure systems documentation.


LCLS2

Ritendra starts today he will be assigned to the LCLS2 Monday to help with controls. The ECAD designer was extended through May.


3. Manpower

Ritendra starts today. He has an office and has a computer.


4. Info from Will

1. LN2 contract proposals are in and have been routed to DOE for approval.

2. New director starts Apr 3.

3. Let Will know if anyone approaches us to provide an estimate for installing an LCLS2 module in LERF.

4. Funding could impact summer shutdown schedule possibly forcing the shutdown of CHL2 earlier than the May bill read. Possibly as early as 23 March. We are moving ahead with electrical installation and fabrication of the piping spools for this job.

5. LERF is still hoping to get the medical isotope contract in 18'


5. Other

Machie send out a request asking how many people still use ME10.


Action Items

1. Must keep meeting to no more than 30 minutes

2. Plan the replacement of the SC2 power feedthrus.


Action Item Updates

1. Kandice Carter took pictures of two of our new engineers for engineers week.

2.