Difference between revisions of "Meeting - Feb 24, 2017"
Line 24: | Line 24: | ||
Pressure Taps for reading pump pressure with valve closed. | Pressure Taps for reading pump pressure with valve closed. | ||
- Install pressure tap at suction of each guard vac pump so we can attach portable vac gauge. | - Install pressure tap at suction of each guard vac pump so we can attach portable vac gauge. | ||
− | - Install DP Switch to prevent oil backflow, similar to SNS. | + | - Install DP Switch to prevent oil backflow, similar to SNS. Need to select DP switch |
- DP Switch to be wired into starter box (series w/ Inlet solenoid) | - DP Switch to be wired into starter box (series w/ Inlet solenoid) | ||
Line 37: | Line 37: | ||
Removing handrail. | Removing handrail. | ||
− | - Will be done ASAP after Conduit is moved. | + | - Will be done ASAP after Conduit is moved. Get with Wright to ID the exact locations. |
Securing the skid base to the floor | Securing the skid base to the floor | ||
− | - | + | - Cut and remove feet. Grout. Re-weld feet (maybe new feet) at new height. |
− | |||
Instrument air branch. | Instrument air branch. |
Latest revision as of 14:05, 27 February 2017
New GV Skid Meetings
Attendance
Creel, Radovic, Dixon, Wright, Norton, Schleeper, Roland
Goals
Discussion about Guard Vac issues remaining
Agenda and Notes
'Conduit rework' Put conduit above control enclosures.
Instrument Box size - Smaller box for terminals/PTs... - Leaving on left side of guard vac skid (with back to SBR MCC)
Limit Switch on the Inlet Solenoids - Yes.
Pressure Taps for reading pump pressure with valve closed. - Install pressure tap at suction of each guard vac pump so we can attach portable vac gauge. - Install DP Switch to prevent oil backflow, similar to SNS. Need to select DP switch - DP Switch to be wired into starter box (series w/ Inlet solenoid)
Panel for displaying pump pressures (digital readouts) - Not at this time ($ concerns)
Stack Lights for on/off display - Tentative No.
Location of linac guard vac gauge panel. - Remove gauge panel completely...
Removing handrail. - Will be done ASAP after Conduit is moved. Get with Wright to ID the exact locations.
Securing the skid base to the floor - Cut and remove feet. Grout. Re-weld feet (maybe new feet) at new height.
Instrument air branch.
- In the process of drawings being made.
Action Items
1.
Action Item Updates
1.