--Add documents to docushare and recreate PS-7 for C9 Header
 
  
  --Sight Glass Assembly Installation at Kinney Pump - Received needs to be cut.
+
  --Relief spool OSP (in review)
  
  --Addressing EV245RT Leak. Currently working on identifying exact repair kit information.  
+
  --CHL2 Relief Valve OSP
 +
 
 +
--New Kinney Tank (Leaked sealed/$1400 repair quote from Triad-schedule with Shirley)
 +
 
 +
--EV development (drawing in process, most parts ordered)
 +
 
 +
--CTF Inventory Calculation Refinement
 +
 
 +
--P&I for Nate on removing and installing the junction box relief valves
 +
 +
--Drawings for review LL sensor, relief valve set drawings, compressor relief valve dwg. (Complete)
 +
  -Order forms
 +
  -OSP
 +
 
 +
--CHL2 RVs
 +
 
 +
--CTF Dewar and Main Compressor Relief Valves.  
 +
 
 +
--Working on changing the next three relief valves, RV2450, RV243SU and RV243RT.
  
 
  --Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
 
  --Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
Line 11: Line 28:
 
  --Install the C.V. on C9
 
  --Install the C.V. on C9
  
  --LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms
+
  --Pressure Systems Part 9 review and comments to K. Dixon -Done
 +
--Flexitallic Flange torque requirements -Done
 +
 
 +
--Develop Milestone/schedule -Done
 +
 
 +
-Someone to cut Kinney Sight glass.  -Done
 +
 
 +
--FlowSafe Dwgs per selected based on calculation. -Done
 +
 
 +
--Sightglass for the RV on compressors -Done
 +
 +
 
 +
--KelF ring for EV245RT/DWG Dimensions.  -Done
 +
 
 +
--Addressing EV245RT Leak. Currently working on repair.  -Done 
 +
 
 +
 
 +
 
 +
--Sight Glass Assembly Installation at Kinney Pump -  -Done 
 +
 
  
 
  --Relief Valve Instrumentation/Protected Zones (CTF Complete)
 
  --Relief Valve Instrumentation/Protected Zones (CTF Complete)
-Schedule service of two to six relief valves during shutdown. Plan for addressing all relief valves developed, RV2081, RV2420, RV2440 Ready for this shutdown, Address the relief valves on the Bayonet Cans.
 
--Pressure test the spools. (complete)
 
--Install
 
  
--Id. all RV Category on spreadsheet.
 
  
  -Id relief valves on CHL2  
+
--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.
 +
 
 +
  --Id relief valves on CHL2  
  
 
  --Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
 
  --Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
  Order four (4) liquid level indicators and Corey will assign someone for the drawings. The John C Ernst Valves will be serviced during the down.  
+
  Waiting for the drawings to be completed. The John C Ernst soft parts are on order.
  
 
  --CHL Recovery Compressor Header Redesign
 
  --CHL Recovery Compressor Header Redesign
Line 38: Line 72:
  
 
  --Recovery Compressor Pipe Analysis (Complete)
 
  --Recovery Compressor Pipe Analysis (Complete)
 +
--LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)
 +
--Bolting "Procedure" - complete
 +
--Shaft Seal on Kinney for M. Wright - complete

Latest revision as of 11:51, 17 May 2017

--Relief spool OSP (in review)
--CHL2 Relief Valve OSP
--New Kinney Tank (Leaked sealed/$1400 repair quote from Triad-schedule with Shirley)
--EV development (drawing in process, most parts ordered)
--CTF Inventory Calculation Refinement
--P&I for Nate on removing and installing the junction box relief valves

--Drawings for review LL sensor, relief valve set drawings, compressor relief valve dwg. (Complete)
  -Order forms
  -OSP
--CHL2 RVs
--CTF Dewar and Main Compressor Relief Valves. 
--Working on changing the next three relief valves, RV2450, RV243SU and RV243RT.  
--Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
--CTF Recovery Compressor C4 and C6 P&I 
--Install the C.V. on C9
--Pressure Systems Part 9 review and comments to K. Dixon -Done
--Flexitallic Flange torque requirements -Done
--Develop Milestone/schedule -Done
-Someone to cut Kinney Sight glass.  -Done
--FlowSafe Dwgs per selected based on calculation. -Done
--Sightglass for the RV on compressors -Done

--KelF ring for EV245RT/DWG Dimensions.  -Done
--Addressing EV245RT Leak. Currently working on repair.  -Done  


--Sight Glass Assembly Installation at Kinney Pump -  -Done  


--Relief Valve Instrumentation/Protected Zones (CTF Complete)


--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.

--Id relief valves on CHL2 
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
Waiting for the drawings to be completed. The John C Ernst soft parts are on order.  
--CHL Recovery Compressor Header Redesign

--Develop CTF Document - Ongoing
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
--CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
 --Recovery Compressor LOTO Review (Complete)-Second Review Complete
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
--Recovery Compressor Pipe Analysis (Complete)
--LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)
--Bolting "Procedure" - complete
--Shaft Seal on Kinney for M. Wright - complete