Difference between revisions of "Group Priorities FY17"
From Cryowiki
Jump to navigationJump to search (Created page with "== Current Fabrication Shop Priorities == The priorities are always changing. Cryogenics Operations 12GeV Hall B CTF LN2 VJ line repair (during a CTF shutdown) GPP CTF Ga...") |
|||
Line 1: | Line 1: | ||
+ | Keep in mind that priorities are always fluctuating. This list is for general information. Specific questions should be directed to your supervisor. | ||
+ | |||
== Current Fabrication Shop Priorities == | == Current Fabrication Shop Priorities == | ||
− | |||
− | |||
Cryogenics Operations | Cryogenics Operations | ||
Line 38: | Line 38: | ||
SBR Piping Removal | SBR Piping Removal | ||
− | |||
== Current Electrical Shop Priorities == | == Current Electrical Shop Priorities == |
Revision as of 14:54, 4 January 2017
Keep in mind that priorities are always fluctuating. This list is for general information. Specific questions should be directed to your supervisor.
Current Fabrication Shop Priorities
Cryogenics Operations
12GeV Hall B
CTF LN2 VJ line repair (during a CTF shutdown)
GPP CTF Gas Management Tie Ins (during a CTF shutdown)
UIM CTF CB3
UITF Thermosiphon and piping
UITF UTubes
UIM CHL2 C6
LCLS2 Recovery Compressors
ESR Hall A 15K UTube
LCLS2 Guard Vacuum
CHL vaporizer
CHL C7
LINAC Spare UTubes
UITF HDIce return line
CHL2 Shield UTubes
CHL2 Water Solenoid
SBR Piping Removal
Current Electrical Shop Priorities
Cryogenics Operations
12GeV Hall B
UIM CTF CB3 and Controls Upgrade
UITF Controls
UIM CHL2 C6
LCLS2 Recovery Compressors
LCLS2 Guard Vacuum
CHL C7