Line 1: Line 1:
 +
Keep in mind that priorities are always fluctuating. This list is for general information. Specific questions should be directed to your supervisor.
 +
 
== Current Fabrication Shop Priorities ==
 
== Current Fabrication Shop Priorities ==
 
The priorities are always changing.
 
  
 
Cryogenics Operations
 
Cryogenics Operations
Line 38: Line 38:
  
 
SBR Piping Removal
 
SBR Piping Removal
 
  
 
== Current Electrical Shop Priorities ==
 
== Current Electrical Shop Priorities ==

Revision as of 14:54, 4 January 2017

Keep in mind that priorities are always fluctuating. This list is for general information. Specific questions should be directed to your supervisor.

Current Fabrication Shop Priorities

Cryogenics Operations

12GeV Hall B

CTF LN2 VJ line repair (during a CTF shutdown)

GPP CTF Gas Management Tie Ins (during a CTF shutdown)

UIM CTF CB3

UITF Thermosiphon and piping

UITF UTubes

UIM CHL2 C6

LCLS2 Recovery Compressors

ESR Hall A 15K UTube

LCLS2 Guard Vacuum

CHL vaporizer

CHL C7

LINAC Spare UTubes

UITF HDIce return line

CHL2 Shield UTubes

CHL2 Water Solenoid

SBR Piping Removal

Current Electrical Shop Priorities

Cryogenics Operations

12GeV Hall B

UIM CTF CB3 and Controls Upgrade

UITF Controls

UIM CHL2 C6

LCLS2 Recovery Compressors

LCLS2 Guard Vacuum

CHL C7