Difference between revisions of "Nate Laverdure work items"

From Cryowiki
Jump to navigationJump to search
Line 1: Line 1:
 
==MSU FRIB==
 
==MSU FRIB==
'''Outstanding work items'''
 
 
 
Organize and publish pressure system documentation for main compressor system
 
Organize and publish pressure system documentation for main compressor system
 
* Update flexibility analysis of large main helium piping in cold box room and compressor room; perform calculations for hangers and supports
 
* Update flexibility analysis of large main helium piping in cold box room and compressor room; perform calculations for hangers and supports
Line 13: Line 11:
 
==SLAC LCLS-II==
 
==SLAC LCLS-II==
 
Prepare 2k cold box design materials for February 2017 FDR
 
Prepare 2k cold box design materials for February 2017 FDR
 +
 +
==JLab==
 +
Organize cryo pressure systems
 +
* to supersede existing cryo pressure systems work package filing system
 +
* to provide a place for filing recurring inspections of systems and equipment
 +
* to provide a place for documenting future repairs/alterations
 +
* to integrate with the pressure systems work being done by other groups

Revision as of 12:08, 19 January 2017

MSU FRIB

Organize and publish pressure system documentation for main compressor system

  • Update flexibility analysis of large main helium piping in cold box room and compressor room; perform calculations for hangers and supports
  • Review and correct errors in relief valve calc sheets

Review 3 atm helium model in cold box room

  • Create u-tube purge plan in cold box room

Review LS2 cooldown transfer line segment

SLAC LCLS-II

Prepare 2k cold box design materials for February 2017 FDR

JLab

Organize cryo pressure systems

  • to supersede existing cryo pressure systems work package filing system
  • to provide a place for filing recurring inspections of systems and equipment
  • to provide a place for documenting future repairs/alterations
  • to integrate with the pressure systems work being done by other groups