==SLAC LCLS-II==
 
==SLAC LCLS-II==
Prepare 2k cold box design materials for February 2017 FDR
+
[[SLAC LCLS-II 2K Cold Box | SLAC LCLS-II 2K Cold Box]]
 +
* Prepare 2k cold box design materials for February 2017 FDR
  
 
==JLab==
 
==JLab==

Revision as of 12:24, 19 January 2017

MSU FRIB

Organize and publish pressure system documentation for main compressor system

  • Update flexibility analysis of large main helium piping in cold box room and compressor room; perform calculations for hangers and supports
  • Review and correct errors in relief valve calc sheets

Review 3 atm helium model in cold box room

  • Create u-tube purge plan in cold box room

Review LS2 cooldown transfer line segment

SLAC LCLS-II

SLAC LCLS-II 2K Cold Box

  • Prepare 2k cold box design materials for February 2017 FDR

JLab

Organize cryo pressure systems

  • to supersede existing cryo pressure systems work package filing system
  • to provide a place for filing recurring inspections of systems and equipment
  • to provide a place for documenting future repairs/alterations
  • to integrate with the pressure systems work being done by other groups