Difference between revisions of "Alicia Saringer work items"

From Cryowiki
Jump to navigationJump to search
Line 1: Line 1:
 +
Dunham-Bush Check Valve Hinge Installation Verification
 +
Recovery Compressor Pipe Analysis
 +
Install the C.V. on C9
 
LCLS II Spreader Analysis
 
LCLS II Spreader Analysis
 
Relief Valve Instrumentation/Protected Zones
 
Relief Valve Instrumentation/Protected Zones
 
Liquid Level Indicator
 
Liquid Level Indicator
 
CHL Recovery Compressor Header Redesign
 
CHL Recovery Compressor Header Redesign
 +
CTF Warm-Up/Cool Down
 +
Kinney Water Line Leak
 +
Relief Valves to Replace at CTF
 +
Sight Glass Assembly Installation at Kinney Pump

Revision as of 17:34, 25 January 2017

Dunham-Bush Check Valve Hinge Installation Verification Recovery Compressor Pipe Analysis Install the C.V. on C9 LCLS II Spreader Analysis Relief Valve Instrumentation/Protected Zones Liquid Level Indicator CHL Recovery Compressor Header Redesign CTF Warm-Up/Cool Down Kinney Water Line Leak Relief Valves to Replace at CTF Sight Glass Assembly Installation at Kinney Pump