Difference between revisions of "Meeting - Feb 24, 2017"
(Created page with "== New GV Skid Meetings == == Attendance == Creel, Radovic, Dixon, Wright, Norton, Schleeper, Roland == Goals == Discussion about Guard Vac issues remaining == Agenda a...") |
|||
Line 12: | Line 12: | ||
== Agenda and Notes == | == Agenda and Notes == | ||
− | Conduit rework | + | 'Conduit rework' |
− | + | Put conduit above control enclosures. | |
Instrument Box size | Instrument Box size |
Revision as of 16:52, 24 February 2017
New GV Skid Meetings
Attendance
Creel, Radovic, Dixon, Wright, Norton, Schleeper, Roland
Goals
Discussion about Guard Vac issues remaining
Agenda and Notes
'Conduit rework' Put conduit above control enclosures.
Instrument Box size - Smaller box for terminals/PTs... - Leaving on left side of guard vac skid (with back to SBR MCC)
Limit Switch on the Inlet Solenoids - Yes.
Pressure Taps for reading pump pressure with valve closed. - Install pressure tap at suction of each guard vac pump so we can attach portable vac gauge. - Install DP Switch to prevent oil backflow, similar to SNS. - DP Switch to be wired into starter box (series w/ Inlet solenoid)
Panel for displaying pump pressures (digital readouts) - Not at this time ($ concerns)
Stack Lights for on/off display - Tentative No.
Location of linac guard vac gauge panel. - Remove gauge panel completely...
Removing handrail. - Will be done ASAP after Conduit is moved.
Securing the skid base to the floor - Bolt it to the floor and shim it.
Instrument air branch.
- In the process of drawings being made.
Action Items
1.
Action Item Updates
1.