Difference between revisions of "Alicia Saringer work items"
From Cryowiki
Jump to navigationJump to searchLine 9: | Line 9: | ||
--Relief Valve Instrumentation/Protected Zones (CTF Complete) | --Relief Valve Instrumentation/Protected Zones (CTF Complete) | ||
− | + | -Schedule service of two to six relief valves during shutdown. Plan for addressing all relief valves developed, RV2081, RV2420, RV2440 Ready for this shutdown, Address the relief valves on the Bayonet Cans. | |
+ | --Pressure test the spools. | ||
+ | --Id. all RV Category on spreadsheet. | ||
− | - | + | -Id relief valves on CHL2 |
− | |||
− | |||
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan. | --Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan. | ||
Planned modified to go on the coalescer and the BOS. | Planned modified to go on the coalescer and the BOS. | ||
− | --CHL Recovery Compressor Header Redesign | + | --CHL Recovery Compressor Header Redesign |
− | |||
− | |||
− | + | CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete | |
− | + | Kinney Water Line Leak-Will be addressed during relocation | |
− | --CTF Recovery Compressor C4 and C6 P&I | + | --CTF Recovery Compressor C4 and C6 P&I |
− | --Recovery Compressor LOTO Review (Complete) | + | --Recovery Compressor LOTO Review (Complete) |
− | --Develop CTF Document - Ongoing | + | --Develop CTF Document - Ongoing |
− | --CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage | + | --CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage |
− | --Dunham-Bush Check Valve Hinge Installation Verification (Complete) | + | --Dunham-Bush Check Valve Hinge Installation Verification (Complete) |
− | --Recovery Compressor Pipe Analysis (Complete) | + | --Recovery Compressor Pipe Analysis (Complete) |
Revision as of 11:03, 27 February 2017
--Sight Glass Assembly Installation at Kinney Pump - Received needs to be cut.
--Addressing EV245RT Leak. Currently working on identifying exact repair kit information.
Install the C.V. on C9
--LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)
--Relief Valve Instrumentation/Protected Zones (CTF Complete)
-Schedule service of two to six relief valves during shutdown. Plan for addressing all relief valves developed, RV2081, RV2420, RV2440 Ready for this shutdown, Address the relief valves on the Bayonet Cans. --Pressure test the spools. --Id. all RV Category on spreadsheet.
-Id relief valves on CHL2
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan. Planned modified to go on the coalescer and the BOS.
--CHL Recovery Compressor Header Redesign
CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
Kinney Water Line Leak-Will be addressed during relocation
--CTF Recovery Compressor C4 and C6 P&I
--Recovery Compressor LOTO Review (Complete)
--Develop CTF Document - Ongoing
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
--Recovery Compressor Pipe Analysis (Complete)