--Sight Glass Assembly Installation at Kinney Pump - Received needs to be cut. | --Sight Glass Assembly Installation at Kinney Pump - Received needs to be cut. | ||
− | |||
Line 14: | Line 13: | ||
--Install the C.V. on C9 | --Install the C.V. on C9 | ||
− | + | ||
--Relief Valve Instrumentation/Protected Zones (CTF Complete) | --Relief Valve Instrumentation/Protected Zones (CTF Complete) | ||
Line 41: | Line 40: | ||
--Recovery Compressor Pipe Analysis (Complete) | --Recovery Compressor Pipe Analysis (Complete) | ||
+ | --LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete) |
Revision as of 11:43, 14 March 2017
--Addressing EV245RT Leak. Currently working on identifying exact repair kit information. Ordered kit and developed a repair plan. Plan developed and under review. Get with SRF/Frank and Ed to see if they are on board or if they want to postpone the plan.
--Add documents to docushare and recreate PS-7 for C9 Header
--Sight Glass Assembly Installation at Kinney Pump - Received needs to be cut.
--Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
--CTF Recovery Compressor C4 and C6 P&I
--Install the C.V. on C9
--Relief Valve Instrumentation/Protected Zones (CTF Complete)
-Schedule service of two to six relief valves during shutdown. Plan for addressing all relief valves developed, RV2081, RV2420, RV2440 Ready for this shutdown, Address the relief valves on the Bayonet Cans. --Pressure test the spools. (complete) --Install
--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.
-Id relief valves on CHL2
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan. Order four (4) liquid level indicators and Corey will assign someone for the drawings. The John C Ernst Valves will be serviced during the down.
--CHL Recovery Compressor Header Redesign --Develop CTF Document - Ongoing
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
--CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
--Recovery Compressor LOTO Review (Complete)-Second Review Complete
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
--Recovery Compressor Pipe Analysis (Complete) --LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)