− | --Addressing EV245RT Leak. Currently working on identifying exact repair kit information. Ordered kit and developed a repair plan. Plan developed and under review. | + | --Addressing EV245RT Leak. Currently working on identifying exact repair kit information. Ordered kit and developed a repair plan. Plan developed and under review. Waiting for Recovery Compressor to be on to perform the task with Frank. |
Line 16: | Line 16: | ||
--Relief Valve Instrumentation/Protected Zones (CTF Complete) | --Relief Valve Instrumentation/Protected Zones (CTF Complete) | ||
− | - | + | -Working on changing the next three relief valves, RV2450, RV243SU and RV243RT. |
− | |||
− | |||
--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant. | --Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant. | ||
− | -Id relief valves on CHL2 | + | --Id relief valves on CHL2 |
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan. | --Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan. | ||
− | + | Waiting for the drawings to be completed. The John C Ernst soft parts are on order. | |
--CHL Recovery Compressor Header Redesign | --CHL Recovery Compressor Header Redesign |
Revision as of 08:07, 22 March 2017
--Addressing EV245RT Leak. Currently working on identifying exact repair kit information. Ordered kit and developed a repair plan. Plan developed and under review. Waiting for Recovery Compressor to be on to perform the task with Frank.
--Add documents to docushare and recreate PS-7 for C9 Header
--Sight Glass Assembly Installation at Kinney Pump - Received needs to be cut.
--Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
--CTF Recovery Compressor C4 and C6 P&I
--Install the C.V. on C9
--Relief Valve Instrumentation/Protected Zones (CTF Complete)
-Working on changing the next three relief valves, RV2450, RV243SU and RV243RT.
--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.
--Id relief valves on CHL2
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan. Waiting for the drawings to be completed. The John C Ernst soft parts are on order.
--CHL Recovery Compressor Header Redesign --Develop CTF Document - Ongoing
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
--CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
--Recovery Compressor LOTO Review (Complete)-Second Review Complete
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
--Recovery Compressor Pipe Analysis (Complete) --LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)