--Bolting "Procedure".
+
 
 
  --Spreadsheets for CTF and new graphs.
 
  --Spreadsheets for CTF and new graphs.
 
  --CTF Inventory Calculation Development
 
  --CTF Inventory Calculation Development
 
  --P&I for Nate on removing and installing the junction box relief valves
 
  --P&I for Nate on removing and installing the junction box relief valves
  --Shaft Seal on Kinney for M. Wright
+
   
 
  --Drawings for review LL sensor, relief valve set drawings, compressor relief valve dwg.  
 
  --Drawings for review LL sensor, relief valve set drawings, compressor relief valve dwg.  
 
  --CHL2 RVs
 
  --CHL2 RVs
Line 67: Line 67:
 
  --Recovery Compressor Pipe Analysis (Complete)
 
  --Recovery Compressor Pipe Analysis (Complete)
 
  --LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)
 
  --LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)
 +
--Bolting "Procedure" - complete
 +
--Shaft Seal on Kinney for M. Wright - complete

Revision as of 14:41, 2 May 2017

--Spreadsheets for CTF and new graphs.
--CTF Inventory Calculation Development
--P&I for Nate on removing and installing the junction box relief valves

--Drawings for review LL sensor, relief valve set drawings, compressor relief valve dwg. 
--CHL2 RVs
--EV development 
--CTF Dewar and Main Compressor Relief Valves. 
--Looking into reducing/mitigating cavitation in the Kinney Pump system to try and bring down the suction line pressure. 
--Working on changing the next three relief valves, RV2450, RV243SU and RV243RT.  
--Add documents to docushare and recreate PS-7 for C9 Header 


--Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
--CTF Recovery Compressor C4 and C6 P&I 
--Install the C.V. on C9
--Pressure Systems Part 9 review and comments to K. Dixon -Done
--Flexitallic Flange torque requirements -Done
--Develop Milestone/schedule -Done
-Someone to cut Kinney Sight glass.  -Done
--FlowSafe Dwgs per selected based on calculation. -Done
--Sightglass for the RV on compressors -Done

--KelF ring for EV245RT/DWG Dimensions.  -Done
--Addressing EV245RT Leak. Currently working on repair.  -Done  


--Sight Glass Assembly Installation at Kinney Pump -  -Done  


--Relief Valve Instrumentation/Protected Zones (CTF Complete)


--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.

--Id relief valves on CHL2 
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
Waiting for the drawings to be completed. The John C Ernst soft parts are on order.  
--CHL Recovery Compressor Header Redesign

--Develop CTF Document - Ongoing
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
--CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
 --Recovery Compressor LOTO Review (Complete)-Second Review Complete
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
--Recovery Compressor Pipe Analysis (Complete)
--LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)
--Bolting "Procedure" - complete
--Shaft Seal on Kinney for M. Wright - complete