'''1. Operations '''
 
'''1. Operations '''
 
LINAC
 
LINAC
 +
 
Problems with MO has stopped beam operations.
 
Problems with MO has stopped beam operations.
  
  
 
CHL1
 
CHL1
 +
 
ESR_CHL Transferline utube installed  
 
ESR_CHL Transferline utube installed  
 
Investigating capacity changes at CHL1. We seem to have less capacity now than one year ago.
 
Investigating capacity changes at CHL1. We seem to have less capacity now than one year ago.
Line 19: Line 21:
  
 
CHL2
 
CHL2
 +
 
Normal
 
Normal
  
  
 
ESR
 
ESR
 +
 
Sending 15K 20g/s to Hall A target
 
Sending 15K 20g/s to Hall A target
 
4K load is at 1410W out of 1500W available from ESR alone.
 
4K load is at 1410W out of 1500W available from ESR alone.
Line 33: Line 37:
  
 
CTF
 
CTF
 +
 
CMTF is testing the new quarter for M. Poelker
 
CMTF is testing the new quarter for M. Poelker
 
VTA/CMTF is not using much capacity.
 
VTA/CMTF is not using much capacity.
Line 39: Line 44:
  
 
HDR
 
HDR
 +
 
Water flow issues over weekend. Flow and supply pressure dropped for unknown reasons and lasted several hours and then self corrected.
 
Water flow issues over weekend. Flow and supply pressure dropped for unknown reasons and lasted several hours and then self corrected.
  
Line 68: Line 74:
 
2. D&I training
 
2. D&I training
 
3. Watch all spending on OPS and ENG accounts
 
3. Watch all spending on OPS and ENG accounts
 
  
 
== Action Items ==
 
== Action Items ==

Latest revision as of 10:46, 13 October 2016


Attendance

Thompson, Creel, Wright, Dixon, Oren,


Agenda and Notes

1. Operations LINAC

Problems with MO has stopped beam operations.


CHL1

ESR_CHL Transferline utube installed Investigating capacity changes at CHL1. We seem to have less capacity now than one year ago.


CHL2

Normal


ESR

Sending 15K 20g/s to Hall A target 4K load is at 1410W out of 1500W available from ESR alone.

Current Loads within approximately 50W Hall A 6 magnets and one target Hall B torus Hall C Old HMS, HB, Q1


CTF

CMTF is testing the new quarter for M. Poelker VTA/CMTF is not using much capacity. We are getting questions from Larry Phillips about being able to supply liquid helium in dewars to the VTA so they can test during the plant shutdown and asked if we could return warm gas back to CHL.


HDR

Water flow issues over weekend. Flow and supply pressure dropped for unknown reasons and lasted several hours and then self corrected.


2. Projects UITF

We can start performing work that is labor only.


MSU

Linde found and repaired the 4K CB internal leak. Linde is finding a lot of leaks in the external process lines. Rao is having them bag everything. The 2K CB is mature and FRIB is taking over their model and LCLS2 will take over their design. MSU is investigating the design of how to swap cold compressors. Fabio wants us to change the model for the compressors from Ideas to Solidworks.


LCLS2

No one from LCLS2 attended the meeting.


3. Manpower

The new EE is scheduled to start on Nov 1.


4. Info from Will 1. Appraisals and new expectations 2. D&I training 3. Watch all spending on OPS and ENG accounts

Action Items

1. Must keep meeting to no more than 30 minutes


Action Item Updates