Difference between revisions of "ESR"
Line 12: | Line 12: | ||
The two endpoints of capacity are approximately (1,500W at 4.5K and 0W 15K) or (800W at 4.5K and 1,200W at 15K). | The two endpoints of capacity are approximately (1,500W at 4.5K and 0W 15K) or (800W at 4.5K and 1,200W at 15K). | ||
− | The addition of the CHL-ESR transferline adds up to | + | The addition of the CHL-ESR transferline adds up to 20 g/s at 4.5K with increased electrical power and LN2 costs at CHL. |
+ | '''2. ESR Reliability ''' | ||
− | ''' | + | Operating ESR at higher capacities will effect availability. |
+ | |||
+ | |||
+ | '''3. FY17 12GeV Needs ''' | ||
''Hall C'' | ''Hall C'' |
Revision as of 09:45, 30 September 2016
Attendance
Creel, Wright, Schleeper, Hasan, Oren, Gomez, Kepple, Meekins, Kashy, Brindza
Agenda and Notes
1. ESR Capacity
ESR is a variable capacity machine producing 4.5K and 15K temperatures.
The two endpoints of capacity are approximately (1,500W at 4.5K and 0W 15K) or (800W at 4.5K and 1,200W at 15K).
The addition of the CHL-ESR transferline adds up to 20 g/s at 4.5K with increased electrical power and LN2 costs at CHL.
2. ESR Reliability
Operating ESR at higher capacities will effect availability.
3. FY17 12GeV Needs
Hall C
Q2 cooldown October 16'
Dipole cooldown in February 16'
Q3 cooldown December 16'
Hall B
Torus stays online
Solenoid cooldown May-July 17'
3. Hall Non-12GeV Needs
Action Items
Attendees will notify cryo of any changes to the plan and future meetings will be held as required.