Difference between revisions of "Nusair Hasan work items"

From Cryowiki
Jump to navigationJump to search
Line 1: Line 1:
 
==Projects==
 
==Projects==
 +
 +
Updated: 1/19/2017
  
 
* LINAC Heater Control Algorithm
 
* LINAC Heater Control Algorithm
Line 6: Line 8:
 
   - Develop design for UI
 
   - Develop design for UI
 
   - Troubleshoot / Find Bugs in the Algorithm
 
   - Troubleshoot / Find Bugs in the Algorithm
 +
 +
* ESR2 Process Model
 +
 +
  - Model Development (Completed FY 2016)
 +
  - Load Support Modes (Completed FY 2016)
 +
  - Mode / Performance Analysis
 +
  - CEC 2017 Paper
 +
 +
* CTF CBX3 Testing Process Model
 +
 +
  - Model Development - Thilan (Completed FY 2016)
 +
  - Testing Spreadsheet Development
 +
  - Testing Modes
 +
  - Analysis
 +
  - Possible CEC 2017 Paper
 +
 +
* CHL2 C6 Commissioning
 +
 +
  - Development of Plans
 +
  - Calculation spreadsheet development
 +
  - Testing and Analysis
 +
 +
* JLAB 2KCBX Performance Analysis
 +
 +
  - Discuss with Rao
 +
 +
* JLAB Operational Procedures
 +
 +
  - CHL2 4K / 2K Pump-down (Completed FY 2016)
 +
  - CHL2 Warm Compressor Start-up / Swing / Switch-over
 +
 +
* JLab Helium Inventory Monitoring
 +
 +
  - Model Development (Completed FY 2015)
 +
  - Data Collection and Revisions (Completed FY 2016)
 +
  - Upgrades
 +
  - CEC 2017 Paper
  
 
==OPS==
 
==OPS==

Revision as of 17:26, 19 January 2017

Projects

Updated: 1/19/2017

  • LINAC Heater Control Algorithm
  - Write-up Pseudo-Code based on Algorithm
  - Develop design for UI
  - Troubleshoot / Find Bugs in the Algorithm
  • ESR2 Process Model
  - Model Development (Completed FY 2016)
  - Load Support Modes (Completed FY 2016)
  - Mode / Performance Analysis
  - CEC 2017 Paper
  • CTF CBX3 Testing Process Model
 - Model Development - Thilan (Completed FY 2016)
 - Testing Spreadsheet Development
 - Testing Modes
 - Analysis
 - Possible CEC 2017 Paper
  • CHL2 C6 Commissioning
 - Development of Plans
 - Calculation spreadsheet development
 - Testing and Analysis
  • JLAB 2KCBX Performance Analysis
 - Discuss with Rao
  • JLAB Operational Procedures
 - CHL2 4K / 2K Pump-down (Completed FY 2016)
 - CHL2 Warm Compressor Start-up / Swing / Switch-over

  • JLab Helium Inventory Monitoring
  - Model Development (Completed FY 2015)
  - Data Collection and Revisions (Completed FY 2016)
  - Upgrades
  - CEC 2017 Paper

OPS