Line 49: Line 49:
  
 
Updated 1/19/2017
 
Updated 1/19/2017
 +
 +
* CHL1 / SC1 / SL-FEL
 +
 +
  - CHL-ESR TL in use for Hall B C/D
 +
  - on that note, we need to schedule a test (possibly at the end of the run) to measure CHL1 capacity (i.e. whether it's able to supply 30 g/s 4K flow without hampering LINAC operations).
 +
  - Measure ESR daily helium losses (whether 'fixing' Hall C U-Tube affected the daily losses).
 +
 +
* CHL2 / SC2 / NL
 +
 +
  - Dewar LL probe is anything but accurate!
 +
  - NL Auto-heat is having issues with RF mis-match (LEM values not set properly).
 +
  - SC2 Trip - Secure Control Development (How to automatically set-up CHL2 in the event of a trip?).
 +
  - iocnl1 reboot-restore issue (is it fixed? Contact: M. Bickley)
 +
  - superMOPS testing

Revision as of 17:38, 19 January 2017

Projects

Updated: 1/19/2017

  • LINAC Heater Control Algorithm
  - Write-up Pseudo-Code based on Algorithm
  - Develop design for UI
  - Troubleshoot / Find Bugs in the Algorithm
  • ESR2 Process Model
  - Model Development (Completed FY 2016)
  - Load Support Modes (Completed FY 2016)
  - Mode / Performance Analysis
  - CEC 2017 Paper
  • CTF CBX3 Testing
 - Model Development - Thilan (Completed FY 2016)
 - Testing Spreadsheet Development
 - Testing Modes
 - Analysis
 - Possible CEC 2017 Paper
  • CHL2 C6 Commissioning
 - Development of Plans
 - Calculation spreadsheet development
 - Testing and Analysis
  • JLab 2KCBX Performance Analysis
 - Discuss with Rao
  • JLab Operational Procedures
 - CHL2 4K / 2K Pump-down (Completed FY 2016)
 - CHL2 Warm Compressor Start-up / Swing / Switch-over

  • JLab Helium Inventory Monitoring
  - Model Development (Completed FY 2015)
  - Data Collection and Revisions (Completed FY 2016)
  - Upgrades
  - CEC 2017 Paper

OPS

Updated 1/19/2017

  • CHL1 / SC1 / SL-FEL
  - CHL-ESR TL in use for Hall B C/D
  - on that note, we need to schedule a test (possibly at the end of the run) to measure CHL1 capacity (i.e. whether it's able to supply 30 g/s 4K flow without hampering LINAC operations).
  - Measure ESR daily helium losses (whether 'fixing' Hall C U-Tube affected the daily losses).
  • CHL2 / SC2 / NL
  - Dewar LL probe is anything but accurate!
  - NL Auto-heat is having issues with RF mis-match (LEM values not set properly).
  - SC2 Trip - Secure Control Development (How to automatically set-up CHL2 in the event of a trip?).
  - iocnl1 reboot-restore issue (is it fixed? Contact: M. Bickley)
  - superMOPS testing