Difference between revisions of "01/27/2017 Meeting"
(Created page with " == Attendance == Thompson, Creel, Dixon, Michalski, Oren == Agenda and Notes == '''1. Operations ''' LINAC LINAC's at 2K Some controls issues were reported with new IO...") |
|||
Line 2: | Line 2: | ||
== Attendance == | == Attendance == | ||
− | Thompson, Creel, Dixon, Michalski, Oren | + | Thompson, Creel, Dixon, Michalski, Oren, Arenius |
== Agenda and Notes == | == Agenda and Notes == | ||
Line 11: | Line 11: | ||
LINAC | LINAC | ||
− | + | MCC and SRF and RF working to understand heat and Q values. They have been doing some studies to gather data. | |
− | |||
− | |||
Line 20: | Line 18: | ||
Normal. | Normal. | ||
− | + | AL/S2M have reported an alignment problem with the CC4 shaft repair. We are gathering information and brainstorming. | |
Line 32: | Line 30: | ||
Normal. | Normal. | ||
− | Transferline valve | + | Transferline valve CAMAC issue has been resolved. |
Issue reported with T2 not spinning down correctly following a trip. We have met and reviewed graphs and discussed possibilities for why the turbine inlet valve is no longer sealing. We have a plan to schedule a date to operate using the transferline, shutdown T2, warm it up, and check the operation and seating force of the inlet valve. If the soft goods are failing it would require a plant warm up to repair. We will reaccess after the warm up and adjustments are tested. | Issue reported with T2 not spinning down correctly following a trip. We have met and reviewed graphs and discussed possibilities for why the turbine inlet valve is no longer sealing. We have a plan to schedule a date to operate using the transferline, shutdown T2, warm it up, and check the operation and seating force of the inlet valve. If the soft goods are failing it would require a plant warm up to repair. We will reaccess after the warm up and adjustments are tested. | ||
Line 50: | Line 48: | ||
Normal. | Normal. | ||
+ | |||
+ | Solenoid is ramping up to receive beam. | ||
Line 57: | Line 57: | ||
UIM | UIM | ||
− | We | + | Shutdown scheduled for Feb 17. We are finalizing the detailed daily work plan. |
UITF | UITF | ||
− | + | Possible space conflict between electrical conduits and mechanical for LN2 subcooler. Conduits with wires are already installed and supporting control system. Chris is investigating. | |
MSU | MSU | ||
− | Working to accumulate the pressure systems documentation. | + | Working to accumulate the pressure systems documentation. Concerns over information sharing. |
LCLS2 | LCLS2 | ||
− | + | Cold compressor review in France went well. Only real surprise was the seismic results forced the manufacturer to increase the thickness of the base plates. Smith Group is an A&E firm to help SLAC put together the installation package. SLAC will not be able to get an installation contract in place until ~Sep even though equipment begins arriving in Apr. | |
Line 78: | Line 78: | ||
New engineer arriving early Feb. He will work 50% of his time on EI&C for LCLS2 and remainder on OPS. | New engineer arriving early Feb. He will work 50% of his time on EI&C for LCLS2 and remainder on OPS. | ||
− | |||
'''4. Info from Will ''' | '''4. Info from Will ''' | ||
− | 1. | + | 1. LN2 contract proposals are in. |
− | |||
− | |||
− | + | 2. Will has asked Mat to put in PR for nitrogen through June. | |
Line 97: | Line 94: | ||
1. Must keep meeting to no more than 30 minutes | 1. Must keep meeting to no more than 30 minutes | ||
− | 2 | + | 2. |
== Action Item Updates == | == Action Item Updates == | ||
1. | 1. |
Revision as of 10:05, 26 January 2017
Attendance
Thompson, Creel, Dixon, Michalski, Oren, Arenius
Agenda and Notes
1. Operations
LINAC
MCC and SRF and RF working to understand heat and Q values. They have been doing some studies to gather data.
CHL1
Normal.
AL/S2M have reported an alignment problem with the CC4 shaft repair. We are gathering information and brainstorming.
CHL2
Normal
ESR
Normal.
Transferline valve CAMAC issue has been resolved.
Issue reported with T2 not spinning down correctly following a trip. We have met and reviewed graphs and discussed possibilities for why the turbine inlet valve is no longer sealing. We have a plan to schedule a date to operate using the transferline, shutdown T2, warm it up, and check the operation and seating force of the inlet valve. If the soft goods are failing it would require a plant warm up to repair. We will reaccess after the warm up and adjustments are tested.
CTF
Normal
Kinney #2 ring pump spun a bearing. The ring pump has been moved to the repair facility in Chesapeake. There is no spare Kinney at CTF until it returns.
The LCLS2 cryomodule is under test.
HDR
Normal.
Solenoid is ramping up to receive beam.
2. Projects
UIM
Shutdown scheduled for Feb 17. We are finalizing the detailed daily work plan.
UITF
Possible space conflict between electrical conduits and mechanical for LN2 subcooler. Conduits with wires are already installed and supporting control system. Chris is investigating.
MSU
Working to accumulate the pressure systems documentation. Concerns over information sharing.
LCLS2
Cold compressor review in France went well. Only real surprise was the seismic results forced the manufacturer to increase the thickness of the base plates. Smith Group is an A&E firm to help SLAC put together the installation package. SLAC will not be able to get an installation contract in place until ~Sep even though equipment begins arriving in Apr.
3. Manpower
New engineer arriving early Feb. He will work 50% of his time on EI&C for LCLS2 and remainder on OPS.
4. Info from Will
1. LN2 contract proposals are in.
2. Will has asked Mat to put in PR for nitrogen through June.
5. Other
Action Items
1. Must keep meeting to no more than 30 minutes
2.
Action Item Updates
1.