Difference between revisions of "01/27/2017 Meeting"

From Cryowiki
Jump to navigationJump to search
(Created page with " == Attendance == Thompson, Creel, Dixon, Michalski, Oren == Agenda and Notes == '''1. Operations ''' LINAC LINAC's at 2K Some controls issues were reported with new IO...")
 
Line 2: Line 2:
 
== Attendance ==
 
== Attendance ==
  
Thompson, Creel, Dixon, Michalski, Oren
+
Thompson, Creel, Dixon, Michalski, Oren, Arenius
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 11: Line 11:
 
LINAC
 
LINAC
  
LINAC's at 2K
+
MCC and SRF and RF working to understand heat and Q values. They have been doing some studies to gather data.
 
 
Some controls issues were reported with new IOC restore routines for RF. Routine was intermittently restoring heat values to manual with zero heat.
 
  
  
Line 20: Line 18:
 
Normal.
 
Normal.
  
No updates from AL/S2M.
+
AL/S2M have reported an alignment problem with the CC4 shaft repair. We are gathering information and brainstorming.
  
  
Line 32: Line 30:
 
Normal.  
 
Normal.  
  
Transferline valve is not functioning. The guys have a plan to change the CAMAC card this morning.
+
Transferline valve CAMAC issue has been resolved.
  
 
Issue reported with T2 not spinning down correctly following a trip. We have met and reviewed graphs and discussed possibilities for why the turbine inlet valve is no longer sealing. We have a plan to schedule a date to operate using the transferline, shutdown T2, warm it up, and check the operation and seating force of the inlet valve. If the soft goods are failing it would require a plant warm up to repair. We will reaccess after the warm up and adjustments are tested.
 
Issue reported with T2 not spinning down correctly following a trip. We have met and reviewed graphs and discussed possibilities for why the turbine inlet valve is no longer sealing. We have a plan to schedule a date to operate using the transferline, shutdown T2, warm it up, and check the operation and seating force of the inlet valve. If the soft goods are failing it would require a plant warm up to repair. We will reaccess after the warm up and adjustments are tested.
Line 50: Line 48:
  
 
Normal.  
 
Normal.  
 +
 +
Solenoid is ramping up to receive beam.
  
  
Line 57: Line 57:
 
UIM
 
UIM
  
We will move ahead with the CB3 installation and the remainder of the controls upgrade starting Feb 17.
+
Shutdown scheduled for Feb 17. We are finalizing the detailed daily work plan.
  
  
 
UITF
 
UITF
  
Pressure tests completed on transferline. The HDIce return line and electrical and controls work remain. Vacuum leaks in the transferline shell were located and sealed.  
+
Possible space conflict between electrical conduits and mechanical for LN2 subcooler. Conduits with wires are already installed and supporting control system. Chris is investigating.  
  
  
 
MSU
 
MSU
  
Working to accumulate the pressure systems documentation.
+
Working to accumulate the pressure systems documentation. Concerns over information sharing.  
  
  
 
LCLS2
 
LCLS2
  
?
+
Cold compressor review in France went well. Only real surprise was the seismic results forced the manufacturer to increase the thickness of the base plates. Smith Group is an A&E firm to help SLAC put together the installation package. SLAC will not be able to get an installation contract in place until ~Sep even though equipment begins arriving in Apr.
  
  
Line 78: Line 78:
  
 
New engineer arriving early Feb.  He will work 50% of his time on EI&C for LCLS2 and remainder on OPS.
 
New engineer arriving early Feb.  He will work 50% of his time on EI&C for LCLS2 and remainder on OPS.
 
  
  
 
'''4. Info from Will '''
 
'''4. Info from Will '''
  
1. Watch spending on OPS and ENG accounts. Try to keep spending to critical "stop work" items.
+
1. LN2 contract proposals are in.
 
 
2. We will likely be on continuing resolution for the full FY all the way until FY18
 
  
3. LN2 contract proposals are in.
+
2. Will has asked Mat to put in PR for nitrogen through June.
  
  
Line 97: Line 94:
 
1. Must keep meeting to no more than 30 minutes
 
1. Must keep meeting to no more than 30 minutes
  
2. Kelly and Jonathan will work on proposal for the SLAC operations support agreement.
+
2.  
  
  
 
== Action Item Updates ==
 
== Action Item Updates ==
 
1.
 
1.

Revision as of 10:05, 26 January 2017

Attendance

Thompson, Creel, Dixon, Michalski, Oren, Arenius

Agenda and Notes

1. Operations

LINAC

MCC and SRF and RF working to understand heat and Q values. They have been doing some studies to gather data.


CHL1

Normal.

AL/S2M have reported an alignment problem with the CC4 shaft repair. We are gathering information and brainstorming.


CHL2

Normal


ESR

Normal.

Transferline valve CAMAC issue has been resolved.

Issue reported with T2 not spinning down correctly following a trip. We have met and reviewed graphs and discussed possibilities for why the turbine inlet valve is no longer sealing. We have a plan to schedule a date to operate using the transferline, shutdown T2, warm it up, and check the operation and seating force of the inlet valve. If the soft goods are failing it would require a plant warm up to repair. We will reaccess after the warm up and adjustments are tested.


CTF

Normal

Kinney #2 ring pump spun a bearing. The ring pump has been moved to the repair facility in Chesapeake. There is no spare Kinney at CTF until it returns.

The LCLS2 cryomodule is under test.


HDR

Normal.

Solenoid is ramping up to receive beam.


2. Projects


UIM

Shutdown scheduled for Feb 17. We are finalizing the detailed daily work plan.


UITF

Possible space conflict between electrical conduits and mechanical for LN2 subcooler. Conduits with wires are already installed and supporting control system. Chris is investigating.


MSU

Working to accumulate the pressure systems documentation. Concerns over information sharing.


LCLS2

Cold compressor review in France went well. Only real surprise was the seismic results forced the manufacturer to increase the thickness of the base plates. Smith Group is an A&E firm to help SLAC put together the installation package. SLAC will not be able to get an installation contract in place until ~Sep even though equipment begins arriving in Apr.


3. Manpower

New engineer arriving early Feb. He will work 50% of his time on EI&C for LCLS2 and remainder on OPS.


4. Info from Will

1. LN2 contract proposals are in.

2. Will has asked Mat to put in PR for nitrogen through June.


5. Other

Action Items

1. Must keep meeting to no more than 30 minutes

2.


Action Item Updates

1.