Difference between revisions of "Alicia Saringer work items"
From Cryowiki
Jump to navigationJump to searchLine 1: | Line 1: | ||
Dunham-Bush Check Valve Hinge Installation Verification | Dunham-Bush Check Valve Hinge Installation Verification | ||
+ | |||
Recovery Compressor Pipe Analysis | Recovery Compressor Pipe Analysis | ||
+ | |||
Install the C.V. on C9 | Install the C.V. on C9 | ||
− | LCLS II Spreader Analysis | + | |
+ | LCLS II Spreader Analysis (Complete) | ||
+ | |||
Relief Valve Instrumentation/Protected Zones | Relief Valve Instrumentation/Protected Zones | ||
+ | |||
Liquid Level Indicator | Liquid Level Indicator | ||
+ | |||
CHL Recovery Compressor Header Redesign | CHL Recovery Compressor Header Redesign | ||
+ | |||
CTF Warm-Up/Cool Down | CTF Warm-Up/Cool Down | ||
+ | |||
Kinney Water Line Leak | Kinney Water Line Leak | ||
+ | |||
Relief Valves to Replace at CTF | Relief Valves to Replace at CTF | ||
+ | |||
Sight Glass Assembly Installation at Kinney Pump | Sight Glass Assembly Installation at Kinney Pump |
Revision as of 16:04, 26 January 2017
Dunham-Bush Check Valve Hinge Installation Verification
Recovery Compressor Pipe Analysis
Install the C.V. on C9
LCLS II Spreader Analysis (Complete)
Relief Valve Instrumentation/Protected Zones
Liquid Level Indicator
CHL Recovery Compressor Header Redesign
CTF Warm-Up/Cool Down
Kinney Water Line Leak
Relief Valves to Replace at CTF
Sight Glass Assembly Installation at Kinney Pump