==MSU FRIB== | ==MSU FRIB== | ||
Organize and publish pressure system documentation for pressure systems. Actions are as listed in the summary document. | Organize and publish pressure system documentation for pressure systems. Actions are as listed in the summary document. | ||
+ | |||
+ | -IA complete | ||
+ | -GV complete | ||
+ | -LND awaiting confirmation of wind loading from thermax |
Revision as of 09:39, 27 January 2017
JLab
1/25 Update Organize cryo pressure systems
- CHL:
# Replacement/upgrade of LN2 fill station gauging: -Materials: On-site -Pressure System: Standard Maintenance -Drawings: N/A -Fabrication: N/A -Operations: Working. Tank 2 complete. -Testing: Snoop upon installation.
# CHL Guard Vacuum -Materials: Ordered, expected on-site week of // 1/23 -Pressure System: Signed -Drawings: Complete -Fabrication: N/A -Operations: N/A -Testing: To be initial service leak checked upon completion of electrical work. Pump temperatures will also need to be monitored.
# LN2 Dewar #1 instrumentation tubing replacement -Materials: Ordered -Pressure System: Back in DA review -Drawings: Complete -Fabrication: pending material/dpf -Operations: N/A -Testing: To be initial service leak checked upon completion.
# LN2 PBC leaks -Materials: TBD -Pressure System: TBD -Drawings: TBD -Fabrication: TBD -Operations: All leaks have been identified and need to be tabulated and planned for repair/replacement. -Testing: TBD
# CHL Recovery Purifier Sieve replacement -Materials: on-site -Pressure System: N/A -Drawings: N/A -Fabrication: N/A -Operations: P5 sieve replaced and being cleaned. -Testing: N/A
# ESR ORS Carbon Replacement -Materials: Need to be identified and ordered. -Pressure System: N/A -Drawings: Need to be developed. -Fabrication: awaiting drawings -Operations: Needs to be scheduled/planned. -Testing: Snoop at joints. Spool pieces will need to be tested.
# ESR 15K U-tube -Materials: Being ordered -Pressure System: in review -Drawings: issued. -Fabrication: awaiting materials -Operations: U-tube will be stabbed at earliest convenience -Testing: pressure test per DPF
# ESR Oil collection -Materials: TBD -Pressure System: TBD -Drawings: TBD -Fabrication: TBD -Operations: May require piping removal or plant shutdown -Testing: not likely. category D piping at most.
ESR Status
- Halls A, B, and C are cold and on cold return.
- Hall C is cooling SHMS Q3 to 100K. U-tubes were stabbed Tuesday.
- Hall C will stab dipole u-tubes next week.
- Hall C target system is being cleaned. Not connected to ESR or recovery as of now.
- CHL-ESR x-fer line will be in use occasionally over the next week.
- T2 was warmed with no clear benefit. Developing actions to remedy the situation
MSU FRIB
Organize and publish pressure system documentation for pressure systems. Actions are as listed in the summary document.
-IA complete -GV complete -LND awaiting confirmation of wind loading from thermax