Difference between revisions of "David Schleeper work items"
From Cryowiki
Jump to navigationJump to search (→JLab) |
|||
Line 12: | Line 12: | ||
2 CHL Guard Vacuum | 2 CHL Guard Vacuum | ||
− | -Materials: | + | -Materials: Arrived. Mechanical assembly is complete. |
-Pressure System: Signed | -Pressure System: Signed | ||
-Drawings: Complete | -Drawings: Complete | ||
Line 21: | Line 21: | ||
3 LN2 Dewar #1 instrumentation tubing replacement | 3 LN2 Dewar #1 instrumentation tubing replacement | ||
-Materials: Ordered | -Materials: Ordered | ||
− | -Pressure System: | + | -Pressure System: Signed |
-Drawings: Complete | -Drawings: Complete | ||
− | -Fabrication: pending material | + | -Fabrication: pending material |
-Operations: N/A | -Operations: N/A | ||
-Testing: To be initial service leak checked upon completion. | -Testing: To be initial service leak checked upon completion. | ||
Line 33: | Line 33: | ||
-Drawings: TBD | -Drawings: TBD | ||
-Fabrication: TBD | -Fabrication: TBD | ||
− | -Operations: All leaks have been identified and | + | -Operations: All leaks have been identified and tabulated. Ops is investigating the repair of threaded connections. |
− | -Testing: | + | -Testing: Snoop |
Line 47: | Line 47: | ||
6 ESR ORS Carbon Replacement | 6 ESR ORS Carbon Replacement | ||
− | -Materials: Need to be identified and ordered. | + | -Materials: Need to be identified and ordered. Trying to find approval system for lifting adapters. |
-Pressure System: N/A | -Pressure System: N/A | ||
-Drawings: Need to be developed. | -Drawings: Need to be developed. | ||
Line 55: | Line 55: | ||
7 ESR 15K U-tube | 7 ESR 15K U-tube | ||
− | -Materials: | + | -Materials: ordered |
− | -Pressure System: | + | -Pressure System: signed |
-Drawings: issued. | -Drawings: issued. | ||
-Fabrication: awaiting materials | -Fabrication: awaiting materials | ||
Line 71: | Line 71: | ||
==ESR Status== | ==ESR Status== | ||
− | #Halls A, B, and C are | + | #Halls A, B, and C are on cold return. Hall C magnets filling. |
− | #Hall C is cooling SHMS | + | #Hall C is cooling SHMS Dipole to 100K. U-tubes were stabbed Tuesday. |
− | |||
#Hall C target system is being cleaned. Not connected to ESR or recovery as of now. | #Hall C target system is being cleaned. Not connected to ESR or recovery as of now. | ||
#CHL-ESR x-fer line will be in use occasionally over the next week. | #CHL-ESR x-fer line will be in use occasionally over the next week. | ||
− | #T2 | + | #T2 will need to be stopped to facilitate simple trouble shooting on inlet valve/actuator. |
==MSU FRIB== | ==MSU FRIB== | ||
Line 83: | Line 82: | ||
#IA complete | #IA complete | ||
#GV complete | #GV complete | ||
− | #LND | + | #LND complete |
+ | #waiting for examination docs from embler. |
Revision as of 14:21, 1 February 2017
JLab
1/25 Update Organize cryo pressure systems
- CHL:
1 Replacement/upgrade of LN2 fill station gauging: -Materials: On-site -Pressure System: Standard Maintenance -Drawings: N/A -Fabrication: N/A -Operations: Working. Tank 2 complete. -Testing: Snoop upon installation.
2 CHL Guard Vacuum -Materials: Arrived. Mechanical assembly is complete. -Pressure System: Signed -Drawings: Complete -Fabrication: N/A -Operations: N/A -Testing: To be initial service leak checked upon completion of electrical work. Pump temperatures will also need to be monitored.
3 LN2 Dewar #1 instrumentation tubing replacement -Materials: Ordered -Pressure System: Signed -Drawings: Complete -Fabrication: pending material -Operations: N/A -Testing: To be initial service leak checked upon completion.
4 LN2 PBC leaks -Materials: TBD -Pressure System: TBD -Drawings: TBD -Fabrication: TBD -Operations: All leaks have been identified and tabulated. Ops is investigating the repair of threaded connections. -Testing: Snoop
5 CHL Recovery Purifier Sieve replacement -Materials: on-site -Pressure System: N/A -Drawings: N/A -Fabrication: N/A -Operations: P5 sieve replaced and being cleaned. -Testing: N/A
6 ESR ORS Carbon Replacement -Materials: Need to be identified and ordered. Trying to find approval system for lifting adapters. -Pressure System: N/A -Drawings: Need to be developed. -Fabrication: awaiting drawings -Operations: Needs to be scheduled/planned. -Testing: Snoop at joints. Spool pieces will need to be tested.
7 ESR 15K U-tube -Materials: ordered -Pressure System: signed -Drawings: issued. -Fabrication: awaiting materials -Operations: U-tube will be stabbed at earliest convenience -Testing: pressure test per DPF
8 ESR Oil collection -Materials: TBD -Pressure System: TBD -Drawings: TBD -Fabrication: TBD -Operations: May require piping removal or plant shutdown -Testing: not likely. category D piping at most.
ESR Status
- Halls A, B, and C are on cold return. Hall C magnets filling.
- Hall C is cooling SHMS Dipole to 100K. U-tubes were stabbed Tuesday.
- Hall C target system is being cleaned. Not connected to ESR or recovery as of now.
- CHL-ESR x-fer line will be in use occasionally over the next week.
- T2 will need to be stopped to facilitate simple trouble shooting on inlet valve/actuator.
MSU FRIB
Organize and publish pressure system documentation for pressure systems. Actions are as listed in the summary document.
- IA complete
- GV complete
- LND complete
- waiting for examination docs from embler.