Difference between revisions of "Alicia Saringer work items"

From Cryowiki
Jump to navigationJump to search
Line 1: Line 1:
 
Dunham-Bush Check Valve Hinge Installation Verification (Complete)
 
Dunham-Bush Check Valve Hinge Installation Verification (Complete)
  
Recovery Compressor Pipe Analysis
+
Recovery Compressor Pipe Analysis (Complete)
  
 
Install the C.V. on C9
 
Install the C.V. on C9
  
LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication...
+
LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft
  
 
Relief Valve Instrumentation/Protected Zones (CTF Complete)
 
Relief Valve Instrumentation/Protected Zones (CTF Complete)
  
-Schedule service of two to six relief valves during shutdown.
+
-Schedule service of two to six relief valves during shutdown. Plan for addressing all relief valves developed, RV2081, RV2420, RV2440 Ready for this shutdown, Address the relief valves on the Bayonet Cans.  
  
 
-Continue to the other plants.  
 
-Continue to the other plants.  
  
Liquid Level Indicator
+
Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
  
 
CHL Recovery Compressor Header Redesign
 
CHL Recovery Compressor Header Redesign
  
CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)
+
CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
  
Kinney Water Line Leak
+
Kinney Water Line Leak-Complete
  
 
Relief Valves to Replace at CTF (Complete)
 
Relief Valves to Replace at CTF (Complete)
  
Sight Glass Assembly Installation at Kinney Pump - ETA 2/2/2017
+
Sight Glass Assembly Installation at Kinney Pump - ETA 2/7/2017
 +
 
 +
CTF Recovery Compressor C4 and C6 P&I
  
 
Develop CTF Document - Ongoing
 
Develop CTF Document - Ongoing
  
 
CTF Spreadsheets - Ongoing
 
CTF Spreadsheets - Ongoing

Revision as of 16:30, 7 February 2017

Dunham-Bush Check Valve Hinge Installation Verification (Complete)

Recovery Compressor Pipe Analysis (Complete)

Install the C.V. on C9

LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft

Relief Valve Instrumentation/Protected Zones (CTF Complete)

-Schedule service of two to six relief valves during shutdown. Plan for addressing all relief valves developed, RV2081, RV2420, RV2440 Ready for this shutdown, Address the relief valves on the Bayonet Cans.

-Continue to the other plants.

Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.

CHL Recovery Compressor Header Redesign

CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete

Kinney Water Line Leak-Complete

Relief Valves to Replace at CTF (Complete)

Sight Glass Assembly Installation at Kinney Pump - ETA 2/7/2017

CTF Recovery Compressor C4 and C6 P&I

Develop CTF Document - Ongoing

CTF Spreadsheets - Ongoing