==JLab== | ==JLab== | ||
− | + | 2/13 Update | |
Organize cryo pressure systems | Organize cryo pressure systems | ||
* CHL: | * CHL: | ||
Line 12: | Line 12: | ||
2 CHL Guard Vacuum | 2 CHL Guard Vacuum | ||
− | -Materials: | + | -Materials: installed |
-Pressure System: Signed | -Pressure System: Signed | ||
-Drawings: Complete | -Drawings: Complete | ||
Line 42: | Line 42: | ||
-Drawings: N/A | -Drawings: N/A | ||
-Fabrication: N/A | -Fabrication: N/A | ||
− | -Operations: P5 sieve replaced and | + | -Operations: P5 sieve replaced and ready for use. |
-Testing: N/A | -Testing: N/A | ||
6 ESR ORS Carbon Replacement | 6 ESR ORS Carbon Replacement | ||
− | -Materials: Need to be identified and ordered. | + | -Materials: Need to be identified and ordered. Rusty sprouse reviewing lifting adapter. |
-Pressure System: N/A | -Pressure System: N/A | ||
-Drawings: Need to be developed. | -Drawings: Need to be developed. | ||
Line 58: | Line 58: | ||
-Pressure System: signed | -Pressure System: signed | ||
-Drawings: issued. | -Drawings: issued. | ||
− | -Fabrication: | + | -Fabrication: in fabrication |
-Operations: U-tube will be stabbed at earliest convenience | -Operations: U-tube will be stabbed at earliest convenience | ||
-Testing: pressure test per DPF | -Testing: pressure test per DPF | ||
Line 69: | Line 69: | ||
-Operations: May require piping removal or plant shutdown | -Operations: May require piping removal or plant shutdown | ||
-Testing: not likely. category D piping at most. | -Testing: not likely. category D piping at most. | ||
+ | |||
+ | |||
+ | 9 CHL IA modification | ||
+ | -Materials: ordered | ||
+ | -Pressure System: TBD | ||
+ | -Drawings: in development | ||
+ | -Fabrication: TBD | ||
+ | -Operations: N/A | ||
+ | -Testing: Initial service leak test | ||
==ESR Status== | ==ESR Status== |
Revision as of 14:58, 13 February 2017
JLab
2/13 Update Organize cryo pressure systems
- CHL:
1 Replacement/upgrade of LN2 fill station gauging: -Materials: On-site -Pressure System: Standard Maintenance -Drawings: N/A -Fabrication: N/A -Operations: Working. Tank 2 complete. -Testing: Snoop upon installation.
2 CHL Guard Vacuum -Materials: installed -Pressure System: Signed -Drawings: Complete -Fabrication: N/A -Operations: N/A -Testing: To be initial service leak checked upon completion of electrical work. Pump temperatures will also need to be monitored.
3 LN2 Dewar #1 instrumentation tubing replacement -Materials: Ordered -Pressure System: Signed -Drawings: Complete -Fabrication: pending material -Operations: N/A -Testing: To be initial service leak checked upon completion.
4 LN2 PBC leaks -Materials: TBD -Pressure System: TBD -Drawings: TBD -Fabrication: TBD -Operations: All leaks have been identified and tabulated. Ops is investigating the repair of threaded connections. -Testing: Snoop
5 CHL Recovery Purifier Sieve replacement -Materials: on-site -Pressure System: N/A -Drawings: N/A -Fabrication: N/A -Operations: P5 sieve replaced and ready for use. -Testing: N/A
6 ESR ORS Carbon Replacement -Materials: Need to be identified and ordered. Rusty sprouse reviewing lifting adapter. -Pressure System: N/A -Drawings: Need to be developed. -Fabrication: awaiting drawings -Operations: Needs to be scheduled/planned. -Testing: Snoop at joints. Spool pieces will need to be tested.
7 ESR 15K U-tube -Materials: ordered -Pressure System: signed -Drawings: issued. -Fabrication: in fabrication -Operations: U-tube will be stabbed at earliest convenience -Testing: pressure test per DPF
8 ESR Oil collection -Materials: TBD -Pressure System: TBD -Drawings: TBD -Fabrication: TBD -Operations: May require piping removal or plant shutdown -Testing: not likely. category D piping at most.
9 CHL IA modification -Materials: ordered -Pressure System: TBD -Drawings: in development -Fabrication: TBD -Operations: N/A -Testing: Initial service leak test
ESR Status
- Halls A, B, and C are on cold return. Hall C magnets filling.
- Hall C is cooling SHMS Dipole to 100K. U-tubes were stabbed Tuesday.
- Hall C target system is being cleaned. Not connected to ESR or recovery as of now.
- CHL-ESR x-fer line will be in use occasionally over the next week.
- T2 will need to be stopped to facilitate simple trouble shooting on inlet valve/actuator.
MSU FRIB
Organize and publish pressure system documentation for pressure systems. Actions are as listed in the summary document.
- IA complete
- GV complete
- LND complete
- waiting for examination docs from embler.