   --Addressing EV245RT Leak. Currently working on identifying exact repair kit information. Ordered kit and developed a repair plan. Plan developed and under review. Get with SRF/Frank and Ed to see if they are on board or if they want to postpone the plan.  
+
   --Addressing EV245RT Leak. Currently working on identifying exact repair kit information. Ordered kit and developed a repair plan. Plan developed and under review. Waiting for Recovery Compressor to be on to perform the task with Frank.
  
  
Line 16: Line 16:
  
 
  --Relief Valve Instrumentation/Protected Zones (CTF Complete)
 
  --Relief Valve Instrumentation/Protected Zones (CTF Complete)
-Schedule service of two to six relief valves during shutdown. Plan for addressing all relief valves developed, RV2081, RV2420, RV2440 Ready for this shutdown, Address the relief valves on the Bayonet Cans.
+
-Working on changing the next three relief valves, RV2450, RV243SU and RV243RT.  
--Pressure test the spools. (complete)
 
--Install
 
  
 
--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.  
 
--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.  
  
  -Id relief valves on CHL2  
+
  --Id relief valves on CHL2  
  
 
  --Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
 
  --Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
  Order four (4) liquid level indicators and Corey will assign someone for the drawings. The John C Ernst Valves will be serviced during the down.  
+
  Waiting for the drawings to be completed. The John C Ernst soft parts are on order.
  
 
  --CHL Recovery Compressor Header Redesign
 
  --CHL Recovery Compressor Header Redesign

Revision as of 08:07, 22 March 2017

 --Addressing EV245RT Leak. Currently working on identifying exact repair kit information. Ordered kit and developed a repair plan. Plan developed and under review. Waiting for Recovery Compressor to be on to perform the task with Frank.  


--Add documents to docushare and recreate PS-7 for C9 Header

--Sight Glass Assembly Installation at Kinney Pump - Received needs to be cut. 


--Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
--CTF Recovery Compressor C4 and C6 P&I 
--Install the C.V. on C9


--Relief Valve Instrumentation/Protected Zones (CTF Complete)

-Working on changing the next three relief valves, RV2450, RV243SU and RV243RT.

--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.

--Id relief valves on CHL2 
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
Waiting for the drawings to be completed. The John C Ernst soft parts are on order.  
--CHL Recovery Compressor Header Redesign

--Develop CTF Document - Ongoing
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
--CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
 --Recovery Compressor LOTO Review (Complete)-Second Review Complete
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
--Recovery Compressor Pipe Analysis (Complete)
--LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)