10/13/2016 Meeting

From Cryowiki
Revision as of 10:46, 13 October 2016 by Creel (talk | contribs) (→‎Agenda and Notes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search


Attendance

Thompson, Creel, Wright, Dixon, Oren,


Agenda and Notes

1. Operations LINAC

Problems with MO has stopped beam operations.


CHL1

ESR_CHL Transferline utube installed Investigating capacity changes at CHL1. We seem to have less capacity now than one year ago.


CHL2

Normal


ESR

Sending 15K 20g/s to Hall A target 4K load is at 1410W out of 1500W available from ESR alone.

Current Loads within approximately 50W Hall A 6 magnets and one target Hall B torus Hall C Old HMS, HB, Q1


CTF

CMTF is testing the new quarter for M. Poelker VTA/CMTF is not using much capacity. We are getting questions from Larry Phillips about being able to supply liquid helium in dewars to the VTA so they can test during the plant shutdown and asked if we could return warm gas back to CHL.


HDR

Water flow issues over weekend. Flow and supply pressure dropped for unknown reasons and lasted several hours and then self corrected.


2. Projects UITF

We can start performing work that is labor only.


MSU

Linde found and repaired the 4K CB internal leak. Linde is finding a lot of leaks in the external process lines. Rao is having them bag everything. The 2K CB is mature and FRIB is taking over their model and LCLS2 will take over their design. MSU is investigating the design of how to swap cold compressors. Fabio wants us to change the model for the compressors from Ideas to Solidworks.


LCLS2

No one from LCLS2 attended the meeting.


3. Manpower

The new EE is scheduled to start on Nov 1.


4. Info from Will 1. Appraisals and new expectations 2. D&I training 3. Watch all spending on OPS and ENG accounts

Action Items

1. Must keep meeting to no more than 30 minutes


Action Item Updates