Conference Call with AL/S2M 24 Jan 17

From Cryowiki
Revision as of 12:46, 24 January 2017 by Creel (talk | contribs) (→‎Agenda and Notes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

JLAB Attendance

Creel, Wright, Arenius

Al/S2M Attendance

Panchali, Emmanual


Agenda and Notes

1. Initial Findings

Air Liquid and S2M reported the axis of the three flat spots where the wheel mounts are no longer aligned with the axis of the main shaft.


2. Discussion

AL/S2M stated they believe the problem did not arise from the sputtering and machine work but they did not take complete measurements before the work was performed so they cant say for certain.


3. Decision

It was decided to allow both parties to consider the information and try to brainstorm options from this point. Another meeting will be set for one week from today.

Action Item Updates

1.