Alicia Saringer work items

From Cryowiki
Revision as of 15:49, 1 March 2017 by Saringer (talk | contribs)
Jump to navigationJump to search

--Add documents to docushare and recreate PS-7 for C9 Header

--Sight Glass Assembly Installation at Kinney Pump - Received needs to be cut.

--Addressing EV245RT Leak. Currently working on identifying exact repair kit information. 

Install the C.V. on C9

--LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms
--Relief Valve Instrumentation/Protected Zones (CTF Complete)

-Schedule service of two to six relief valves during shutdown. Plan for addressing all relief valves developed, RV2081, RV2420, RV2440 Ready for this shutdown, Address the relief valves on the Bayonet Cans. --Pressure test the spools.

--Id. all RV Category on spreadsheet.

-Id relief valves on CHL2 (Complete)
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
Planned modified to go on the coalescer and the BOS.  
--CHL Recovery Compressor Header Redesign
CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
--CTF Recovery Compressor C4 and C6 P&I 
--Recovery Compressor LOTO Review (Complete)-Second Review Complete
--Develop CTF Document - Ongoing
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
--Recovery Compressor Pipe Analysis (Complete)