Alicia Saringer work items

From Cryowiki
Revision as of 08:08, 22 March 2017 by Saringer (talk | contribs)
Jump to navigationJump to search
 --Addressing EV245RT Leak. Currently working on identifying exact repair kit information. Ordered kit and developed a repair plan. Plan developed and under review. Waiting for Recovery Compressor to be on to perform the task with Frank.  


--Add documents to docushare and recreate PS-7 for C9 Header 
--Sight Glass Assembly Installation at Kinney Pump - Received needs to be cut. 


--Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
--CTF Recovery Compressor C4 and C6 P&I 
--Install the C.V. on C9


--Relief Valve Instrumentation/Protected Zones (CTF Complete)

-Working on changing the next three relief valves, RV2450, RV243SU and RV243RT.

--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.

--Id relief valves on CHL2 
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
Waiting for the drawings to be completed. The John C Ernst soft parts are on order.  
--CHL Recovery Compressor Header Redesign

--Develop CTF Document - Ongoing
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
--CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
 --Recovery Compressor LOTO Review (Complete)-Second Review Complete
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
--Recovery Compressor Pipe Analysis (Complete)
--LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)