Group Priorities FY17

From Cryowiki
Revision as of 14:53, 4 January 2017 by Creel (talk | contribs) (Created page with "== Current Fabrication Shop Priorities == The priorities are always changing. Cryogenics Operations 12GeV Hall B CTF LN2 VJ line repair (during a CTF shutdown) GPP CTF Ga...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Current Fabrication Shop Priorities

The priorities are always changing.

Cryogenics Operations

12GeV Hall B

CTF LN2 VJ line repair (during a CTF shutdown)

GPP CTF Gas Management Tie Ins (during a CTF shutdown)

UIM CTF CB3

UITF Thermosiphon and piping

UITF UTubes

UIM CHL2 C6

LCLS2 Recovery Compressors

ESR Hall A 15K UTube

LCLS2 Guard Vacuum

CHL vaporizer

CHL C7

LINAC Spare UTubes

UITF HDIce return line

CHL2 Shield UTubes

CHL2 Water Solenoid

SBR Piping Removal


Current Electrical Shop Priorities

Cryogenics Operations

12GeV Hall B

UIM CTF CB3 and Controls Upgrade

UITF Controls

UIM CHL2 C6

LCLS2 Recovery Compressors

LCLS2 Guard Vacuum

CHL C7