Meeting Jan 11, 2017

From Cryowiki
Revision as of 14:34, 11 January 2017 by Creel (talk | contribs) (Created page with "== Attendance == Creel, Wright, S. Thompson, Wijeratne == Summary for Meeting == Installation of the UIM cold box is one of the labs highest priorities. It must be completed...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Attendance

Creel, Wright, S. Thompson, Wijeratne

Summary for Meeting

Installation of the UIM cold box is one of the labs highest priorities. It must be completed. We are to implement all measures to complete the work ahead of schedule. The shutdown of the testlabs testing schedule is a major hit to the lab and we need to be creative and find ways to do it efficiently.


Agenda and Notes

1. Schedule



2. Manpower


3. Drawings


Action Items

1.

2.


3.