Meeting - Feb 24, 2017
New GV Skid Meetings
Attendance
Creel, Radovic, Dixon, Wright, Norton, Schleeper, Roland
Goals
Discussion about Guard Vac issues remaining
Agenda and Notes
Conduit rework - Put conduit above control enclosures.
Instrument Box size - Smaller box for terminals/PTs... - Leaving on left side of guard vac skid (with back to SBR MCC)
Limit Switch on the Inlet Solenoids - Yes.
Pressure Taps for reading pump pressure with valve closed. - Install pressure tap at suction of each guard vac pump so we can attach portable vac gauge. - Install DP Switch to prevent oil backflow, similar to SNS. - DP Switch to be wired into starter box (series w/ Inlet solenoid)
Panel for displaying pump pressures (digital readouts) - Not at this time ($ concerns)
Stack Lights for on/off display - Tentative No.
Location of linac guard vac gauge panel. - Remove gauge panel completely...
Removing handrail. - Will be done ASAP after Conduit is moved.
Securing the skid base to the floor - Bolt it to the floor and shim it.
Instrument air branch.
- In the process of drawings being made.
Action Items
1.
Action Item Updates
1.