Alicia Saringer work items

From Cryowiki
Revision as of 10:45, 20 April 2017 by Saringer (talk | contribs)
Jump to navigationJump to search
--Bolting "Procedure".
--Spreadsheets for CTF and new graphs.
--CTF Inventory Calculation Development
--P&I for Nate on removing and installing the junction box relief valves
--Shaft Seal on Kinney for M. Wright
--Drawings for review LL sensor, relief valve set drawings, compressor relief valve dwg. 
--CHL2 RVs
--EV development 
--CTF Dewar and Main Compressor Relief Valves. 
--Looking into reducing/mitigating cavitation in the Kinney Pump system to try and bring down the suction line pressure. 
--Working on changing the next three relief valves, RV2450, RV243SU and RV243RT.  
--Add documents to docushare and recreate PS-7 for C9 Header 


--Kinney Water Line Leak-Will be addressed during relocation. By-pass line leakage
--CTF Recovery Compressor C4 and C6 P&I 
--Install the C.V. on C9
--Pressure Systems Part 9 review and comments to K. Dixon -Done
--Flexitallic Flange torque requirements -Done
--Develop Milestone/schedule -Done
-Someone to cut Kinney Sight glass.  -Done
--FlowSafe Dwgs per selected based on calculation. -Done
--Sightglass for the RV on compressors -Done

--KelF ring for EV245RT/DWG Dimensions.  -Done
--Addressing EV245RT Leak. Currently working on repair.  -Done  


--Sight Glass Assembly Installation at Kinney Pump -  -Done  


--Relief Valve Instrumentation/Protected Zones (CTF Complete)


--Id. all RV Category on spreadsheet completed. Proceed to inspect then in accordance with the IC and get all ASME relief valves in the plant.

--Id relief valves on CHL2 
--Liquid Level Indicator determined to go on the coalescer. Develop a drawing and plan.
Waiting for the drawings to be completed. The John C Ernst soft parts are on order.  
--CHL Recovery Compressor Header Redesign

--Develop CTF Document - Ongoing
--CTF Spreadsheets - Ongoing - Get with Bill about full startup after power outage
--CTF Warm-Up/Cool Down (Complete-Review Thilan's plan)-Complete
 --Recovery Compressor LOTO Review (Complete)-Second Review Complete
--Dunham-Bush Check Valve Hinge Installation Verification (Complete)
--Recovery Compressor Pipe Analysis (Complete)
--LCLS II Spreader Analysis (Complete), Start White Paper (Complete), Comment Adjudication (Complete), Incorporate Comments and Develop Final Draft(Complete)-Revise to incorporate different lifting mechanisms --(Complete)