General Meeting Summary 7/30/15

From Cuawiki
Jump to navigation Jump to search

SWEEPING MAGNET

  • Design: Dipole and 2 plates (field clamp and corrector coil)
  • Fringe fields should be manageable
  • Power supply: requirements much less than SBS (~2000 A) power supply
  • Additional steel required for WACS is part of UK funding proposal. This additional steel can be attached to the side of the magnet
  • Next steps
  • 3D geometry check with HC infrastructure, e.g., vertical clearance, fit on pivot etc. (Charles, designers, ...)
  • Re-do radiation calculations (Hamlet, Rolf, Pavel, TH)


READOUT

  • Working on trigger, summed fADC trigger, single crate configuration to simplify the setup


NPS TEMPERATURE

  • Nominal temperature: 18 degrees with good stabilization (+- 0.5 degrees)
  • Flexible design if need to cool down later


NPS COLLABORATION MEETING

  • Best seems to be adjacent to HC/HA meetings in January 2016


ITEMS FOR NEXT MEETING:


  • Other...


NEXT MEETING: THUR 20 AUGUST, TIME: 9:30 AM (EDT)