Difference between revisions of "CPS Summary 1/23/18"
Jump to navigation
Jump to search
(Created page with "ROTATING TARGET * Discussion about rotation scheme and mechanical movement and material PION-KAON PHYSICS * Discussion about new physics with a K-long beam K-LONG BEAM E...") |
|||
Line 11: | Line 11: | ||
K-LONG BEAM EXPERIMENT | K-LONG BEAM EXPERIMENT | ||
− | * | + | * Experiment will access KLp --> Ksp and KLp --> pi+Lambda at a KL rate of 10^4 KL/s - this is 2500 times SLAC |
+ | |||
+ | * Main background is from neutrons, key goal for radcon is a dose rate of 1mrem/hr at the ceiling above the Gluex detector | ||
+ | |||
+ | * Discussion about the number of days required (currently 100 days in proposal) | ||
+ | |||
+ | * Next steps: | ||
+ | ::* get PAC approval | ||
+ | ::* for proposal may include for CPS: tagger area, first engineering changes for Hall D, simulations with CPS only | ||
+ | ::* evaluate different configurations for different number of days to address questions about required beam time |
Revision as of 17:48, 28 January 2018
ROTATING TARGET
- Discussion about rotation scheme and mechanical movement and material
PION-KAON PHYSICS
- Discussion about new physics with a K-long beam
K-LONG BEAM EXPERIMENT
- Experiment will access KLp --> Ksp and KLp --> pi+Lambda at a KL rate of 10^4 KL/s - this is 2500 times SLAC
- Main background is from neutrons, key goal for radcon is a dose rate of 1mrem/hr at the ceiling above the Gluex detector
- Discussion about the number of days required (currently 100 days in proposal)
- Next steps:
- get PAC approval
- for proposal may include for CPS: tagger area, first engineering changes for Hall D, simulations with CPS only
- evaluate different configurations for different number of days to address questions about required beam time