Difference between revisions of "CPS Summary 1/23/18"

From Cuawiki
Jump to navigation Jump to search
(Created page with "ROTATING TARGET * Discussion about rotation scheme and mechanical movement and material PION-KAON PHYSICS * Discussion about new physics with a K-long beam K-LONG BEAM E...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
ROTATING TARGET
+
'''COMPACT PHOTON SOURCE: SCIENCE OPPORTUNITIES AND CONCEPT
 +
'''
 +
* Polarized Wide Angle Compton Scattering - much interesting science, but limitation in current for target (90nA electron beam)
 +
 
 +
* CPS concept: dump electrons and use photons (bremsstrahlung)
 +
 
 +
* CPS challenge is to control radiation, but our studies have shown that is works! - photon flux is ~30 times higher (equivalent photon rate 1x10^12 gamma/s) and opens a new range of polarized physics opportunities at JLab
 +
 
 +
* CPS details:
 +
::* magnet with tapered pole gap, radiation hard, space between poles filled with copper (Cu core), main shielding is tungsten powder
 +
::* shielding logic: design so that have radiation dose comparable to that with that of number of photons on target
 +
 
 +
* Discussion of CPS simulation results
 +
::* comparative study of 90nA electron beam and a pure photon beam producded from 2.7nA electron beam on a 10% radiator (CPS)
 +
::* Studies included: heat load on target, accumulated damage from neutron/photon, activation dose rate around the target, impact of CPS (radiation and damage due to CPS)
 +
::* Result of simulation studies show that CPS concept design works. Some additional shielding in backward region is needed to keep the dose rate <5mrem/hr - currently have 100 mrem/hr in the backward region. Additional shielding may affect placement of diagnostics girder and instrumentation
 +
 
 +
 
 +
'''ROTATING TARGET'''
  
 
* Discussion about rotation scheme and mechanical movement and material
 
* Discussion about rotation scheme and mechanical movement and material
  
  
PION-KAON PHYSICS
+
'''PION-KAON PHYSICS'''
  
 
* Discussion about new physics with a K-long beam
 
* Discussion about new physics with a K-long beam
  
 +
* In general, challenges include: numerical, analysis, and formalism - the experiment would provide data to address these
 +
 +
 +
'''K-LONG BEAM EXPERIMENT'''
 +
 +
* Experiment will access KLp --> Ksp and KLp --> pi+Lambda at a KL rate of 10^4 KL/s - this is 2500 times SLAC
 +
 +
* Main background is from neutrons, key goal for radcon is a dose rate of 1mrem/hr at the ceiling above the Gluex detector
 +
 +
* Discussion about the number of days required (currently 100 days in proposal)
 +
 +
''* Next steps:''
 +
::* get PAC approval
 +
::* for proposal may include for CPS: tagger area, first engineering changes for Hall D, simulations with CPS only
 +
::* evaluate different configurations for different number of days to address questions about required beam time
 +
 +
 +
'''DISCUSSION ABOUT ACTION ITEMS'''
 +
 +
* Remove condition from polarized WACS experiment
 +
::* requires a lab internal review
 +
::* aim is to have the required documentation from PAC by November 2018, so CPS collaboration has to have the document ready in ~5 months from January 2018
  
K-LONG BEAM EXPERIMENT
+
* Get PAC approval for KLong experiment
 +
::* need documentation of basic CPS features by June
  
*
+
* To be done for CPS HC in next 6-9 weeks:
 +
::* Add polarized target and check shielding optimization, e.g. how much W and how much Pb etc.
 +
::* Determine what engineering items to include in internal review document, e.g., temperature, pressure drop, power
 +
::* Meet every 3 weeks

Latest revision as of 18:12, 28 January 2018

COMPACT PHOTON SOURCE: SCIENCE OPPORTUNITIES AND CONCEPT

  • Polarized Wide Angle Compton Scattering - much interesting science, but limitation in current for target (90nA electron beam)
  • CPS concept: dump electrons and use photons (bremsstrahlung)
  • CPS challenge is to control radiation, but our studies have shown that is works! - photon flux is ~30 times higher (equivalent photon rate 1x10^12 gamma/s) and opens a new range of polarized physics opportunities at JLab
  • CPS details:
  • magnet with tapered pole gap, radiation hard, space between poles filled with copper (Cu core), main shielding is tungsten powder
  • shielding logic: design so that have radiation dose comparable to that with that of number of photons on target
  • Discussion of CPS simulation results
  • comparative study of 90nA electron beam and a pure photon beam producded from 2.7nA electron beam on a 10% radiator (CPS)
  • Studies included: heat load on target, accumulated damage from neutron/photon, activation dose rate around the target, impact of CPS (radiation and damage due to CPS)
  • Result of simulation studies show that CPS concept design works. Some additional shielding in backward region is needed to keep the dose rate <5mrem/hr - currently have 100 mrem/hr in the backward region. Additional shielding may affect placement of diagnostics girder and instrumentation


ROTATING TARGET

  • Discussion about rotation scheme and mechanical movement and material


PION-KAON PHYSICS

  • Discussion about new physics with a K-long beam
  • In general, challenges include: numerical, analysis, and formalism - the experiment would provide data to address these


K-LONG BEAM EXPERIMENT

  • Experiment will access KLp --> Ksp and KLp --> pi+Lambda at a KL rate of 10^4 KL/s - this is 2500 times SLAC
  • Main background is from neutrons, key goal for radcon is a dose rate of 1mrem/hr at the ceiling above the Gluex detector
  • Discussion about the number of days required (currently 100 days in proposal)

* Next steps:

  • get PAC approval
  • for proposal may include for CPS: tagger area, first engineering changes for Hall D, simulations with CPS only
  • evaluate different configurations for different number of days to address questions about required beam time


DISCUSSION ABOUT ACTION ITEMS

  • Remove condition from polarized WACS experiment
  • requires a lab internal review
  • aim is to have the required documentation from PAC by November 2018, so CPS collaboration has to have the document ready in ~5 months from January 2018
  • Get PAC approval for KLong experiment
  • need documentation of basic CPS features by June
  • To be done for CPS HC in next 6-9 weeks:
  • Add polarized target and check shielding optimization, e.g. how much W and how much Pb etc.
  • Determine what engineering items to include in internal review document, e.g., temperature, pressure drop, power
  • Meet every 3 weeks