'''ACTION ITEMS'''
 
'''ACTION ITEMS'''
  
* (Jixie/Dustin/Donal) Address the comments on compatibiilty with polarized target as requested in TAC and in Review Report from Aug 2018, e.g. estimate relative uncertainty of target polarization due to  
+
* (Jixie/Dustin/Donal) Address the comments on compatibilty with polarized target as requested in TAC and in Review Report from Aug 2018, e.g. estimate relative uncertainty of target polarization due to  
::* (Jixie) radiation damage caused by electron-positron pair production and target rotation  
+
::* '''(Jixie)''' radiation damage caused by electron-positron pair production and target rotation  
::* (Dustin) Target rotation (mechanical and local damage) - review the reports by JLab and by Chris Keith and make additions and/or modifications in CPS document as needed
+
::* '''(Dustin)''' Target rotation (mechanical and local damage) - review the [https://wiki.jlab.org/cuawiki/images/5/59/CPS_report.pdf reports by JLab] and by Chris Keith and make additions and/or modifications in CPS document as needed
  
* (David H.) Overall editing to address report comment that narrative doesn't flow smoothly and errors in the figure captions
+
* '''(David H.)''' Overall editing to address report comment that narrative doesn't flow smoothly and errors in the figure captions
  
* (David H.) Create an outline of a NIM article in Overleaf
+
* '''(David H.)''' Create an outline of a NIM article in Overleaf
  
* (Bogdan/Rolf/Tanja) Start more detailed draft of NIM article based on David's outline
+
* '''(Bogdan/Rolf/Tanja/...)''' Start more detailed draft of NIM article based on David's outline
  
* (Tanja with Dustin/Donal/Gabriel/Igor) Create first draft of an executive summary for a possible NSF Mid-Scale Research Instrumentation proposal
+
* '''(Tanja with Dustin/Donal/Gabriel/Igor)''' Create first draft of an executive summary for a possible NSF Mid-Scale Research Instrumentation proposal
  
  
 
'''SUMMARY OF THE DISCUSSION'''
 
'''SUMMARY OF THE DISCUSSION'''
  
CPS DOCUMENT
+
[https://wiki.jlab.org/cuawiki/images/0/06/CPS_document-rev8.pdf CPS DOCUMENT REV8]
  
 
* Discussion about status of document updates:
 
* Discussion about status of document updates:
 +
::* '''DONE''' field quality of polarized target - see edits in section III (Bogdan/Rolf)
 +
::* '''DONE''' preliminary tuning of shielding - see section VI, e.g. Fig 25 and  new text near
 +
::* '''DONE''' cost analysis VI.F (Bogdan/Rolf)
 +
::* '''DONE''' added phrasing about activation dose near target after 100 hour run - see figure captions in section V, e.g. Fig 23 (Tanja/Rolf)
 
::* Jixie working on FLUKA simulations on radiation damage estimates - results expected in next two weeks
 
::* Jixie working on FLUKA simulations on radiation damage estimates - results expected in next two weeks
 
::* Discussion about uncertainty due to target rotation and local radiation damage
 
::* Discussion about uncertainty due to target rotation and local radiation damage

Latest revision as of 14:19, 6 December 2018

ACTION ITEMS

  • (Jixie/Dustin/Donal) Address the comments on compatibilty with polarized target as requested in TAC and in Review Report from Aug 2018, e.g. estimate relative uncertainty of target polarization due to
  • (Jixie) radiation damage caused by electron-positron pair production and target rotation
  • (Dustin) Target rotation (mechanical and local damage) - review the reports by JLab and by Chris Keith and make additions and/or modifications in CPS document as needed
  • (David H.) Overall editing to address report comment that narrative doesn't flow smoothly and errors in the figure captions
  • (David H.) Create an outline of a NIM article in Overleaf
  • (Bogdan/Rolf/Tanja/...) Start more detailed draft of NIM article based on David's outline
  • (Tanja with Dustin/Donal/Gabriel/Igor) Create first draft of an executive summary for a possible NSF Mid-Scale Research Instrumentation proposal


SUMMARY OF THE DISCUSSION

CPS DOCUMENT REV8

  • Discussion about status of document updates:
  • DONE field quality of polarized target - see edits in section III (Bogdan/Rolf)
  • DONE preliminary tuning of shielding - see section VI, e.g. Fig 25 and new text near
  • DONE cost analysis VI.F (Bogdan/Rolf)
  • DONE added phrasing about activation dose near target after 100 hour run - see figure captions in section V, e.g. Fig 23 (Tanja/Rolf)
  • Jixie working on FLUKA simulations on radiation damage estimates - results expected in next two weeks
  • Discussion about uncertainty due to target rotation and local radiation damage
  • if ignore radiation damage, then independent of e-beam - all mechanical motion/shock
  • local radiation damage - examine area of overlap of volume exposed to beam and NMR, if total overlap, then know polarization from NMR
  • practical consideration of how to build coil in relation to target rotation - more loops then smaller signal to noise - test setup in progress


POSSIBLE PUBLICATION IN NIM

  • Start with an outline of sections and then fill in with material from CPS document
  • Aiming for instrumentation paper, so not all pieces of current technical document, e.g. regarding the science, may be needed
  • Aim for putting together an initial draft by 2019 Hall A/C Winter meeting and solicit feedback


CPS CONSTRUCTION

  • Competition is NSF-wide
  • There are two classifications depending on funds requested (RI-1 is $6 million to below $20 million) and two categories within: 1) Implementation (e.g., procurement, assembly, construction, commissioning) and 2) Design (e.g., preparations for future mid-scale and larger scale infrastructure. Compared to regular proposals, a larger emphasis is placed on scientific justification, research community priority, broader impacts, and project execution plan.
  • Preliminary proposals are due on 19 February 2019. Full proposals are due 20 May and by invitation only.
  • Compact Photon Source project would likely be RI-1/Implementation. Favorable points include that CPS offers access to unique science that cannot be done otherwise, is basically ready to go, and has community support. Some brainstorming notes:
  • Exclusive photoproduction with very small cross section, c.f. 12 GeV program initially (rare processes) - isolate very small signal to really understand structure
  • novel technology, gain in science, other applications
  • K_Long also aimed at rare processes, where CPS has huge benefit - may appear as other application in proposal as not yet approved by PAC
  • Include: CPS and polarized target
  • Highest priority: write an executive summary draft - unique science summarized in an easily understandable way for people outside NP. Aim to have a first draft within two weeks


NEXT MEETING: TUESDAY 8 JANUARY 2019 AT 3PM (EST)