Difference between revisions of "General Meeting Summary 1/17/19"
Jump to navigation
Jump to search
(Created page with "NPS COLLABORATION MEETING - 1 FEBRUARY * Discussion draft agenda ::* reduce talk time ::* leave breaks - need ~1hour for lunch * Discussion presentation template for ERR rel...") |
|||
Line 17: | Line 17: | ||
::::* Point 9: Documentation (RSAD, COO, ESAD, OSP) - OSP probably for magnet and calorimeter, define what is needed and who will be responsible | ::::* Point 9: Documentation (RSAD, COO, ESAD, OSP) - OSP probably for magnet and calorimeter, define what is needed and who will be responsible | ||
− | * Action items: | + | * '''Action items''': |
::* Have preliminary drafts of documentation | ::* Have preliminary drafts of documentation | ||
::* Prepare task list for 1 Feb collaboration meeting | ::* Prepare task list for 1 Feb collaboration meeting | ||
* ERR dates - send suggestions for dates in frame March-April to Patrizia | * ERR dates - send suggestions for dates in frame March-April to Patrizia | ||
+ | |||
+ | |||
+ | MAGNET UPDATE (Bogdan) | ||
+ | |||
+ | * Magnet ready, water lines have been connected | ||
+ | |||
+ | * Power supply - plan s to energize within next week | ||
+ | |||
+ | |||
+ | FRAME UPDATE (Carlos) | ||
+ | |||
+ | * Good progress on assembly of modules (2 x 2) | ||
+ | ::* improved assembly/disassembly mechanics and procedure, e.g. captive screw that will stay attached to the frame and not fall when trying to disassemble | ||
+ | ::* still looking into some details of attaching fiber, e.g. glue to either crystal or frame | ||
+ | |||
+ | * Design of PCB boards is complete and ready for production | ||
+ | ::* LEDs on board, short fiber to crystal, control LED by flat cables | ||
+ | ::* signal connectors are one end SMA (similar size to LEMO, but more complicated to plug in/out) and LEMO on other end | ||
+ | ::* HV connectors are Ficher (smaller than regular SHV) | ||
+ | |||
+ | * Access to PMTs improved | ||
+ | ::* boards slide like curtain to left/right - can almost access PMTs by hand from the back, but might need to optimize distance | ||
+ | |||
+ | * Cooling | ||
+ | ::* chilled plates around calorimeter crystals | ||
+ | ::* cooled air in space between crystal and PCB - this space is crowded with many cables, poor air flow - difficult to cool | ||
+ | |||
+ | * Temperature gradient crystals | ||
+ | ::* will have probes in the box to measure temperature | ||
+ | ::* discussing fan performance with vendor | ||
+ | ::* isolation from room - boundary condition air | ||
+ | |||
+ | * Time frame - start construction in second half of the year and finish early next year. | ||
+ | |||
+ | * Funds availability - will confirm on 1 Feb | ||
+ | |||
+ | |||
+ | CRYSTALS (Vladimir) | ||
+ | |||
+ | * Completed visual inspection of ~90% of first batch of CRYTUR crystals | ||
+ | ::* NO rejections | ||
+ | |||
+ | * Planning to measure tolerances for frame in next weeks | ||
+ | :: Crystal lengths are same for SICCAS and CRYTUR, but area slightly different | ||
+ | |||
+ | * '''Action Item:''' make matrix where Crytur and SICCAS crystals would go - send numbers to Hamlet | ||
+ | |||
+ | * Prototype: commissioning complete, will present preliminary results at collaboration meeting | ||
NEXT MEETING: COLLABORATION MEETING 1 FEBRUARY | NEXT MEETING: COLLABORATION MEETING 1 FEBRUARY |
Latest revision as of 11:59, 20 January 2019
NPS COLLABORATION MEETING - 1 FEBRUARY
- Discussion draft agenda
- reduce talk time
- leave breaks - need ~1hour for lunch
- Discussion presentation template for ERR related talks
EXPERIMENT READINESS REVIEW (ERR)
- Discussion of draft charge
- Items that need more detailed discussion are points 4, 5, 7, 8, and 9
- Point 4: define pieces and responsibilities
- Point 7: need generated radiation levels, submit preliminary radiation assessment documentation?
- Point 8: Readiness for calorimeter analysis
- Point 9: Documentation (RSAD, COO, ESAD, OSP) - OSP probably for magnet and calorimeter, define what is needed and who will be responsible
- Action items:
- Have preliminary drafts of documentation
- Prepare task list for 1 Feb collaboration meeting
- ERR dates - send suggestions for dates in frame March-April to Patrizia
MAGNET UPDATE (Bogdan)
- Magnet ready, water lines have been connected
- Power supply - plan s to energize within next week
FRAME UPDATE (Carlos)
- Good progress on assembly of modules (2 x 2)
- improved assembly/disassembly mechanics and procedure, e.g. captive screw that will stay attached to the frame and not fall when trying to disassemble
- still looking into some details of attaching fiber, e.g. glue to either crystal or frame
- Design of PCB boards is complete and ready for production
- LEDs on board, short fiber to crystal, control LED by flat cables
- signal connectors are one end SMA (similar size to LEMO, but more complicated to plug in/out) and LEMO on other end
- HV connectors are Ficher (smaller than regular SHV)
- Access to PMTs improved
- boards slide like curtain to left/right - can almost access PMTs by hand from the back, but might need to optimize distance
- Cooling
- chilled plates around calorimeter crystals
- cooled air in space between crystal and PCB - this space is crowded with many cables, poor air flow - difficult to cool
- Temperature gradient crystals
- will have probes in the box to measure temperature
- discussing fan performance with vendor
- isolation from room - boundary condition air
- Time frame - start construction in second half of the year and finish early next year.
- Funds availability - will confirm on 1 Feb
CRYSTALS (Vladimir)
- Completed visual inspection of ~90% of first batch of CRYTUR crystals
- NO rejections
- Planning to measure tolerances for frame in next weeks
- Crystal lengths are same for SICCAS and CRYTUR, but area slightly different
- Action Item: make matrix where Crytur and SICCAS crystals would go - send numbers to Hamlet
- Prototype: commissioning complete, will present preliminary results at collaboration meeting
NEXT MEETING: COLLABORATION MEETING 1 FEBRUARY