Difference between revisions of "NPS ERR Prep 2/1/19"
Jump to navigation
Jump to search
(Created page with "MAGNET * Plan for mapping and running * Safety and operation documents - can check with J. Beaufait, E. Folts, et al. FRAME * Timeline for construction and assembly, and...") |
(No difference)
|
Revision as of 18:29, 2 February 2019
MAGNET
- Plan for mapping and running
- Safety and operation documents - can check with J. Beaufait, E. Folts, et al.
FRAME
- Timeline for construction and assembly, and resources
- Define alignment and survey requirements - how well do we need to know
- note that for NPS at 3-4m from target knowing position to mm is ~0.1mrad
CRYSTALS
- Expected number of crystals and when anticipate to have them
- Finalize layout with final number of SICCAS and CRYTUR crystals