(Created page with "MAGNET * Plan for mapping and running * Safety and operation documents - can check with J. Beaufait, E. Folts, et al. FRAME * Timeline for construction and assembly, and...") |
|||
Line 2: | Line 2: | ||
* Plan for mapping and running | * Plan for mapping and running | ||
+ | ::* Hi-pot testing, hydro testing, checklists, 5 G boundaries and field measurements, controls pre-checked out, measured vs calculated results, safety checks and controls, back out procedures | ||
* Safety and operation documents - can check with J. Beaufait, E. Folts, et al. | * Safety and operation documents - can check with J. Beaufait, E. Folts, et al. | ||
Line 19: | Line 20: | ||
* Finalize layout with final number of SICCAS and CRYTUR crystals | * Finalize layout with final number of SICCAS and CRYTUR crystals | ||
+ | |||
+ | |||
+ | HALL C - MECHANICAL | ||
+ | |||
+ | * Strengthen bottom support, pivot | ||
+ | |||
+ | * Installation plan | ||
+ | |||
+ | |||
+ | HALL C - POWER AND CABLING | ||
+ | |||
+ | * Timeline for decisions and planning | ||
+ | |||
+ | |||
+ | HALL C - DAQ AND ELECTRONICS | ||
+ | |||
+ | * Trigger Bandwidth - highest rate expected from NPS | ||
+ | |||
+ | * Dynamic range expected for signals | ||
+ | |||
+ | |||
+ | HALL C - TRIGGER AND ELECTRONICS | ||
+ | |||
+ | * How software chain handles data rates - online monitoring | ||
+ | |||
+ | * Confirm ~4kHz rate on HMS side |
Revision as of 17:34, 2 February 2019
MAGNET
- Plan for mapping and running
- Hi-pot testing, hydro testing, checklists, 5 G boundaries and field measurements, controls pre-checked out, measured vs calculated results, safety checks and controls, back out procedures
- Safety and operation documents - can check with J. Beaufait, E. Folts, et al.
FRAME
- Timeline for construction and assembly, and resources
- Define alignment and survey requirements - how well do we need to know
- note that for NPS at 3-4m from target knowing position to mm is ~0.1mrad
CRYSTALS
- Expected number of crystals and when anticipate to have them
- Finalize layout with final number of SICCAS and CRYTUR crystals
HALL C - MECHANICAL
- Strengthen bottom support, pivot
- Installation plan
HALL C - POWER AND CABLING
- Timeline for decisions and planning
HALL C - DAQ AND ELECTRONICS
- Trigger Bandwidth - highest rate expected from NPS
- Dynamic range expected for signals
HALL C - TRIGGER AND ELECTRONICS
- How software chain handles data rates - online monitoring
- Confirm ~4kHz rate on HMS side