Difference between revisions of "NPS ERR Prep 2/1/19"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
* Collect information on subsystems | * Collect information on subsystems | ||
+ | |||
MAGNET | MAGNET | ||
Line 24: | Line 25: | ||
* Finalize layout with final number of SICCAS and CRYTUR crystals | * Finalize layout with final number of SICCAS and CRYTUR crystals | ||
+ | |||
+ | |||
+ | HV DIVIDERS AND PMTs | ||
+ | |||
+ | * Check dividers for lower voltage range (600-700 V) - Fernando, Alex S. and student might be able to help too | ||
+ | |||
+ | * Check into bypassing amplifier - Fernando has a way to do that and it affects the easy to modify part of the board | ||
Latest revision as of 13:20, 3 February 2019
GENERAL DOCUMENTATION
- Collect information on subsystems
MAGNET
- Plan for mapping and running
- Hi-pot testing, hydro testing, checklists, 5 G boundaries and field measurements, controls pre-checked out, measured vs calculated results, safety checks and controls, back out procedures
- Safety and operation documents - can check with J. Beaufait, E. Folts, et al.
FRAME
- Timeline for construction and assembly, and resources
- Define alignment and survey requirements - how well do we need to know
- note that for NPS at 3-4m from target knowing position to mm is ~0.1mrad
CRYSTALS
- Expected number of crystals and when anticipate to have them
- Finalize layout with final number of SICCAS and CRYTUR crystals
HV DIVIDERS AND PMTs
- Check dividers for lower voltage range (600-700 V) - Fernando, Alex S. and student might be able to help too
- Check into bypassing amplifier - Fernando has a way to do that and it affects the easy to modify part of the board
HALL C - MECHANICAL
- Strengthen bottom support, pivot
- Installation plan
HALL C - POWER AND CABLING
- Timeline for decisions and planning
HALL C - DAQ AND ELECTRONICS
- Trigger Bandwidth - highest rate expected from NPS (collaboration input)
- Dynamic range expected for signals (collaboration input)
HALL C - TRIGGER AND ELECTRONICS
- How software chain handles data rates - online monitoring
- Confirm ~4kHz rate on HMS side